7916 City Top Blvd
Austin, TX 78724
Level 2 EV charger permitted at 7916 City Top Blvd
A Level 2 EV charger is being installed at 7916 City Top Blvd in Austin. The City of Austin electrical permit, 2026-102345 EP, was filed on August 11, 2026, and is marked final.
Summarized from City of Austin records · updated Aug 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 11, 2026
- since Aug 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedAug 6, 2026
- IssuedAug 11, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 20, 2026
Passed final inspection Aug 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-102345 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7916 City Top Blvd
What is being installed at 7916 City Top Blvd?
A City of Austin permit records the installation of a Level 2 EV charger. Permit 2026-102345 EP was filed on August 11, 2026.
When was the EV charger permit filed?
The permit was filed on August 11, 2026.
What is the permit number for the charger installation?
The City of Austin electrical permit number is 2026-102345 EP.
What is the status of the permit at 7916 City Top Blvd?
The City of Austin lists permit 2026-102345 EP as final.
Is the permit for a Level 2 EV charger?
Yes. The permit description says, “Install level 2 ev charger.”
Also being built nearby
All of 78724- 7904 City Top BlvdSep 22, 2025Install evse · 46 m away
- 7813 Linnie LnNov 24, 2024New in ground pool (144.5 sq ft) with equipment pad · 129 m away
- 7806 Linda Michelle LnMar 29, 2024Installation of a residential rooftop solar system · 140 m away
- 8021 City Top BlvdAug 6, 2025Replacement of an existing water heater replace 40gal gas water heater · 144 m away
- 7801 City Top BlvdSep 25, 2024(xie ziming) - installation of circuit for elec. vehicle charging station - esip · 176 m away
- 7408 Sagira PathSep 29, 2025Install level 2 ev charger · 192 m away
- 7417 Peggie Nell DrApr 2, 2025Install evse · 196 m away
- 7708 City Top BlvdMar 2, 2026Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous · 197 m away
- 8113 Linnie LnFeb 12, 2026Replacement of an existing water heater 40gal tank · 204 m away
- 8120 City Top BlvdJun 6, 2025Install level 2 ev charger · 243 m away
- 7400 Peggie Nell DrDec 9, 2024Express: foundation repair · 273 m away
- 8201 City Top BlvdApr 8, 2024New inground fiberglass pool with concrete decking · 282 m away