7417 Peggie Nell Dr
Austin, TX 78724
7417 Peggie Nell Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7417 Peggie Nell Dr, Austin, TX 78724. The most recent, filed April 2, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Apr 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 2, 2025
- since Apr 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedMar 31, 2025
- IssuedApr 2, 2025
- WorkApr '25 – Sep '25
- Final inspectionApr 2, 2025
Passed final inspection Apr 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-038015 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7417 Peggie Nell Dr
What is being built at 7417 Peggie Nell Dr?
The latest filing (City of Austin permit 2025-038015 EP, April 2, 2025) covers install evse.
How many permits and filings does 7417 Peggie Nell Dr have?
1 filing across 1 project, from April 2, 2025 to April 2, 2025.
Is there other construction near 7417 Peggie Nell Dr?
Yes. Nearby filings include 7408 Sagira Path (install level 2 ev charger, Sep 29, 2025); 7400 Peggie Nell Dr (express: foundation repair, Dec 9, 2024); 7315 Sagira Path (install evse, Jun 10, 2024).
How do I get alerts for new permits at 7417 Peggie Nell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 7408 Sagira PathSep 29, 2025Install level 2 ev charger · 34 m away
- 7400 Peggie Nell DrDec 9, 2024Express: foundation repair · 84 m away
- 7315 Sagira PathJun 10, 2024Install evse · 132 m away
- 7312 Sagira PathJul 16, 2024Add 1.60 kwdc to existing 5.20 kwdc rooftop solar system servicing existing residential only · 148 m away
- 7806 Linda Michelle LnMar 29, 2024Installation of a residential rooftop solar system · 149 m away
- 7801 City Top BlvdSep 25, 2024(xie ziming) - installation of circuit for elec. vehicle charging station - esip · 151 m away
- 7316 Daves Landing DrDec 8, 2023Added a water softener loop from main waterline to home · 180 m away
- 7904 City Top BlvdSep 22, 2025Install evse · 180 m away
- 7708 City Top BlvdMar 2, 2026Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous · 195 m away
- 7916 City Top BlvdAug 11, 2026Install level 2 ev charger · 196 m away
- 8021 City Top BlvdAug 6, 2025Replacement of an existing water heater replace 40gal gas water heater · 215 m away
- 7813 Linnie LnNov 24, 2024New in ground pool (144.5 sq ft) with equipment pad · 227 m away