7904 City Top Blvd
Austin, TX 78724
7904 City Top Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 7904 City Top Blvd, Austin, TX 78724. The most recent, filed September 22, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Sep 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2025
- since Sep 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedSep 19, 2025
- IssuedSep 22, 2025
- WorkSep '25 – Mar '26
- Final inspectionSep 25, 2025
Passed final inspection Sep 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-119347 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7904 City Top Blvd
What is being built at 7904 City Top Blvd?
The latest filing (City of Austin permit 2025-119347 EP, September 22, 2025) covers install evse.
How many permits and filings does 7904 City Top Blvd have?
1 filing across 1 project, from September 22, 2025 to September 22, 2025.
Is there other construction near 7904 City Top Blvd?
Yes. Nearby filings include 7916 City Top Blvd (install level 2 ev charger, Aug 11, 2026); 7813 Linnie Ln (new in ground pool (144.5 sq ft) with equipment pad, Nov 24, 2024); 7801 City Top Blvd ((xie ziming) - installation of circuit for elec. vehicle charging station - esip, Sep 25, 2024).
How do I get alerts for new permits at 7904 City Top Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 7916 City Top BlvdAug 11, 2026Install level 2 ev charger · 46 m away
- 7813 Linnie LnNov 24, 2024New in ground pool (144.5 sq ft) with equipment pad · 89 m away
- 7801 City Top BlvdSep 25, 2024(xie ziming) - installation of circuit for elec. vehicle charging station - esip · 132 m away
- 7708 City Top BlvdMar 2, 2026Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous · 152 m away
- 7806 Linda Michelle LnMar 29, 2024Installation of a residential rooftop solar system · 163 m away
- 7417 Peggie Nell DrApr 2, 2025Install evse · 180 m away
- 8021 City Top BlvdAug 6, 2025Replacement of an existing water heater replace 40gal gas water heater · 181 m away
- 7408 Sagira PathSep 29, 2025Install level 2 ev charger · 184 m away
- 7610 Daves Landing DrAug 24, 2026Replacement of an existing water heater replacing an existing tankless water heater · 247 m away
- 8113 Linnie LnFeb 12, 2026Replacement of an existing water heater 40gal tank · 249 m away
- 7400 Peggie Nell DrDec 9, 2024Express: foundation repair · 249 m away
- 7712 Daves Landing DrJun 5, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 282 m away