7708 City Top Blvd
Austin, TX 78724
Permit covers a hardwired EV charger at 7708 City Top Blvd
An Austin permit covers installation of a hardwired EV charger at 7708 City Top Blvd. The electrical permit, 2026-024116 EP, is dated March 2, 2026, and has final status.
Summarized from City of Austin records · updated Mar 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2026
- since Mar 2, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
- AppliedFeb 27, 2026
- IssuedMar 2, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 20, 2026
Passed final inspection Mar 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
City of Austin permitElectrical PermitFinal- Record
- 2026-024116 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7708 City Top Blvd
What is being built at 7708 City Top Blvd?
An Austin electrical permit covers a hardwired EV charger in the garage, supplied by a new 60-amp, 240-volt circuit.
Is an EV charger being installed at 7708 City Top Blvd?
Yes. Permit 2026-024116 EP, dated March 2, 2026, describes installing a hardwired EV charger on the garage wall.
When was the EV charger permit filed for 7708 City Top Blvd?
The City of Austin permit is dated March 2, 2026. Its status is listed as final.
What electrical work is planned for the charger at 7708 City Top Blvd?
The permit describes a new 60-amp, 240-volt circuit routed from the main panel to the garage through surface-mounted conduit.
How much power will the EV charger at 7708 City Top Blvd use?
The permit says the charger will be installed on a 60-amp circuit and draw up to 48 amps continuously.
Also being built nearby
All of 78724- 7801 City Top BlvdSep 25, 2024(xie ziming) - installation of circuit for elec. vehicle charging station - esip · 44 m away
- 7813 Linnie LnNov 24, 2024New in ground pool (144.5 sq ft) with equipment pad · 100 m away
- 7610 Daves Landing DrAug 24, 2026Replacement of an existing water heater replacing an existing tankless water heater · 102 m away
- 7904 City Top BlvdSep 22, 2025Install evse · 152 m away
- 7712 Daves Landing DrJun 5, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 170 m away
- 7417 Peggie Nell DrApr 2, 2025Install evse · 195 m away
- 7916 City Top BlvdAug 11, 2026Install level 2 ev charger · 197 m away
- 7400 Peggie Nell DrDec 9, 2024Express: foundation repair · 214 m away
- 7408 Sagira PathSep 29, 2025Install level 2 ev charger · 222 m away
- 7316 Daves Landing DrDec 8, 2023Added a water softener loop from main waterline to home · 261 m away
- 7806 Linda Michelle LnMar 29, 2024Installation of a residential rooftop solar system · 276 m away
- 8021 City Top BlvdAug 6, 2025Replacement of an existing water heater replace 40gal gas water heater · 317 m away