Permit covers a hardwired EV charger at 7708 City Top Blvd

An Austin permit covers installation of a hardwired EV charger at 7708 City Top Blvd. The electrical permit, 2026-024116 EP, is dated March 2, 2026, and has final status.

Summarized from City of Austin records · updated Mar 2, 2026

Projects
1
1 filings
Latest filing
Mar 2, 2026
since Mar 2, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

  1. AppliedFeb 27, 2026
  2. IssuedMar 2, 2026
  3. WorkMar '26 – Mar '26
  4. Final inspectionMar 20, 2026

Passed final inspection Mar 20, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

    Install a new 60-amp 240 volt circuit in the 150amp main panel. route the conductors from the main panel into the garage across the garage ceiling through surface mounted conduit. hardwired gm power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7708 City Top Blvd

What is being built at 7708 City Top Blvd?

An Austin electrical permit covers a hardwired EV charger in the garage, supplied by a new 60-amp, 240-volt circuit.

Is an EV charger being installed at 7708 City Top Blvd?

Yes. Permit 2026-024116 EP, dated March 2, 2026, describes installing a hardwired EV charger on the garage wall.

When was the EV charger permit filed for 7708 City Top Blvd?

The City of Austin permit is dated March 2, 2026. Its status is listed as final.

What electrical work is planned for the charger at 7708 City Top Blvd?

The permit describes a new 60-amp, 240-volt circuit routed from the main panel to the garage through surface-mounted conduit.

How much power will the EV charger at 7708 City Top Blvd use?

The permit says the charger will be installed on a 60-amp circuit and draw up to 48 amps continuously.