6400 Huntleigh Way
Austin, TX 78725
One-bedroom container home permitted at 6400 Huntleigh Way
Austin permits indicate a new one-story, one-bedroom, one-bathroom container home, identified as Building #2, at 6400 Huntleigh Way. The building permit was filed May 26, 2026, followed by electrical and plumbing permits on June 24 and June 30.
Summarized from City of Austin records · updated Jun 30, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 30, 2026
- since May 26, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBuilding #2 new 1-story dwelling unit container home 1 bed/1 bath
- AppliedMay 7, 2025
- IssuedJun 30, 2026
- WorkJun '26 – Jan '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsBuilding #2 new 1-story dwelling unit container home 1 bed/1 bath
Building #2 new 1-story dwelling unit container home 1 bed/1 bath
City of Austin permitPlumbing PermitActive- Record
- 2026-023542 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2 new 1-story dwelling unit container home 1 bed/1 bath
Building #2 new 1-story dwelling unit container home 1 bed/1 bath
City of Austin permitElectrical PermitActive- Record
- 2026-023542 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2 new 1-story dwelling unit container home 1 bed/1 bath
Building #2 new 1-story dwelling unit container home 1 bed/1 bath
City of Austin permitBuilding PermitActive- Record
- 2026-023542 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6400 Huntleigh Way
What is being built at 6400 Huntleigh Way in Austin?
Austin permits describe Building #2 as a new one-story container home with one bedroom and one bathroom. The records include building, electrical, and plumbing permits.
When was the 6400 Huntleigh Way home permitted?
The building permit, 2026-023542 BP, was filed May 26, 2026. Electrical permit 2026-023542 EP followed on June 24, and plumbing permit 2026-023542 PP on June 30.
Is the project at 6400 Huntleigh Way a container home?
Yes. The City of Austin permit descriptions identify the proposed one-story dwelling unit as a container home.
How many bedrooms and bathrooms will the Huntleigh Way home have?
The permit descriptions specify one bedroom and one bathroom.
What is being built near Willow East in Austin?
Permits for 6400 Huntleigh Way, about 258 meters from Willow East, describe a new one-story, one-bedroom, one-bathroom container home.
Are the permits for 6400 Huntleigh Way active?
The listed building, electrical, and plumbing permits are each marked Active in the City of Austin records.
Also being built nearby
All of 78725- 4712 Craigwood DrNov 19, 2025Excavate to repair sewer line in yard · 48 m away
- 6403 Craigwood CirJun 12, 2026Replace sewer yard line (up to 30 feet). sewer tap will not be replaced; it is a repair · 55 m away
- 6306 Craigwood CirJun 30, 2026Express- remove and replace roof with similar type material · 96 m away
- 6402 Craigwood CirMar 11, 2026Express: tub-to-shower conversion vent hood replacement · 99 m away
- 6304 Craigwood CirJun 10, 2025Excavate 15 to repair main drain line under house serving guest bathroom excavate 42 trench to repair main sewer drain line in yard · 105 m away
- 4712 Little Hill CirNov 10, 2026Express: foundation repair · 108 m away
- 4705 Craigwood DrNov 26, 2023Customer stated the meter was burning up · 125 m away
- 6301 Craigwood CirOct 29, 2026Replacement of complete existing central heat and air system with or without duct work rc mitchell · 126 m away
- 6300 Huntleigh WayApr 2, 2026Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 4903 Craigwood DrAug 26, 2026Replace defective fp panel and old meter base with new 200a mb panel and 200r meter · 131 m away
- 4713 Little Hill CirApr 1, 2026Express- repair damaged sewer line via tunneling. after foundation repair was completed we were contacted to inspect the sewer line. the main sewer and master bathroom sewer line is damaged. these repairs will not affect the foundation repairs. we foundation peers are not in the way of the tunnel. once repair is completed we will have an engineer inspect the tunnel. an engineer letter will be uploaded for the final inspection · 131 m away
- 4705 Little Hill CirDec 19, 2023Express: repair siding replace windows like for like replace hvac install flooring paint · 156 m away