6403 Craigwood Cir
Austin, TX 78725
Sewer yard line repair permitted at 6403 Craigwood Cir
A sewer yard line repair of up to 30 feet was permitted at 6403 Craigwood Cir in Austin on June 12, 2026. The permit says the sewer tap will not be replaced.
Summarized from City of Austin records · updated Jun 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 12, 2026
- since Jun 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer yard line (up to 30 feet). sewer tap will not be replaced; it is a repair
- AppliedJun 11, 2026
- IssuedJun 12, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 18, 2026
Passed final inspection Jun 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer yard line (up to 30 feet). sewer tap will not be replaced; it is a repair
Replace sewer yard line (up to 30 feet). sewer tap will not be replaced; it is a repair
City of Austin permitPlumbing PermitFinal- Record
- 2026-074650 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6403 Craigwood Cir
What is being built at 6403 Craigwood Cir?
The permit is for a repair, not a new building: it covers replacing up to 30 feet of sewer yard line. The sewer tap will not be replaced.
What work was permitted at 6403 Craigwood Cir in Austin?
The City of Austin issued a plumbing permit for a sewer yard line repair on June 12, 2026. The permit number is 2026-074650 PP.
When was the sewer repair at 6403 Craigwood Cir permitted?
The City of Austin permit was filed on June 12, 2026. It is listed as final.
Is a new home being built at 6403 Craigwood Cir?
The permit record describes a sewer yard line repair of up to 30 feet, not construction of a new home.
What is happening near Travis County Facilities at 6400 FM 969?
At 6403 Craigwood Cir, about 236 meters from Travis County Facilities, a sewer yard line repair was permitted on June 12, 2026. The sewer tap will not be replaced.
Also being built nearby
All of 78725- 6402 Craigwood CirMar 11, 2026Express: tub-to-shower conversion vent hood replacement · 45 m away
- 6400 Huntleigh WayJun 30, 2026Building #2 new 1-story dwelling unit container home 1 bed/1 bath · 55 m away
- 6306 Craigwood CirJun 30, 2026Express- remove and replace roof with similar type material · 59 m away
- 4903 Craigwood DrAug 26, 2026Replace defective fp panel and old meter base with new 200a mb panel and 200r meter · 77 m away
- 6304 Craigwood CirJun 10, 2025Excavate 15 to repair main drain line under house serving guest bathroom excavate 42 trench to repair main sewer drain line in yard · 77 m away
- 4712 Craigwood DrNov 19, 2025Excavate to repair sewer line in yard · 92 m away
- 6301 Craigwood CirOct 29, 2026Replacement of complete existing central heat and air system with or without duct work rc mitchell · 128 m away
- 6300 Huntleigh WayApr 2, 2026Replacement of complete existing central heat and air system with or without duct work · 154 m away
- 4712 Little Hill CirNov 10, 2026Express: foundation repair · 162 m away
- 4705 Craigwood DrNov 26, 2023Customer stated the meter was burning up · 163 m away
- 6301 FM 969 RdNov 11, 2026Eastside hub · 177 m away
- 4713 Little Hill CirApr 1, 2026Express- repair damaged sewer line via tunneling. after foundation repair was completed we were contacted to inspect the sewer line. the main sewer and master bathroom sewer line is damaged. these repairs will not affect the foundation repairs. we foundation peers are not in the way of the tunnel. once repair is completed we will have an engineer inspect the tunnel. an engineer letter will be uploaded for the final inspection · 185 m away