groundranger
Historic · latest filing Jul 2024Residential

10613 Beckwood Dr

Austin, TX 78726

10613 Beckwood Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 10613 Beckwood Dr, Austin, TX 78726. The most recent, filed July 17, 2024, covers: “Express: replace siding on all sides of sfr”.

Compiled from City of Austin records · updated Jul 17, 2024

Projects
1
1 filings
Latest filing
Jul 17, 2024
since Jul 17, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit withdrawn

Express: replace siding on all sides of sfr

  1. AppliedMay 11, 2020
  2. IssuedJul 17, 2024
  3. !WorkJul '24 – Jan '25
  4. Final inspection

Marked withdrawn Aug 20, 2024.

2 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Express: replace siding on all sides of sfr

    Express: replace siding on all sides of sfr

    City of Austin permitBuilding PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10613 Beckwood Dr

What is being built at 10613 Beckwood Dr?

The latest filing (City of Austin permit 2020-072349 BP, July 17, 2024) covers express: replace siding on all sides of sfr.

How many permits and filings does 10613 Beckwood Dr have?

1 filing across 1 project, from July 17, 2024 to July 17, 2024.

Is there other construction near 10613 Beckwood Dr?

Yes. Nearby filings include 10615 Beckwood Dr (at10615 beckwood dr austin tx 78726 we plan to install a new code-compliant in-ground irrigation system designed and supervised by a tceq-licensed irrigator (license li0030033). the system will connect to the city water supply with a tested dcv backflow preventer and a master valve and will be divided into properly sized zones for turf shrub beds and individual trees using a mix of high-efficiency mp rotors and drip emitters. pvc main and lateral lines will be buried to required depth wired through conduit. a wifi compatible controller with rain sensor will automatically adjust watering schedules to meet austin water conservation standards avoiding overspray and runoff. zone layout precipitation rates and run times are based on site hydraulics and plant needs and all components will be installed to meet or exceed city of austin and tceq irrigation rules. upon completion the system will be inspected the backflow device tested by a certified bpat tester and the homeowner instructed in controller operation and seasonal maintenance, Sep 24, 2025); 11301 Nutwood Cv (install roof mounted solar pv system the electric company is pec, Dec 13, 2023); 11214 Crossland Dr (replacement of an existing water heater, Sep 30, 2024).

How do I get alerts for new permits at 10613 Beckwood Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78726
Email me when a new permit is filed