11214 Crossland Dr
Austin, TX 78726
11214 Crossland Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11214 Crossland Dr, Austin, TX 78726. The most recent, filed September 30, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Sep 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2024
- since Sep 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedSep 23, 2024
- IssuedSep 30, 2024
- WorkSep '24 – Oct '24
- Final inspectionOct 7, 2024
Passed final inspection Oct 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-128877 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11214 Crossland Dr
What is being built at 11214 Crossland Dr?
The latest filing (City of Austin permit 2024-128877 PP, September 30, 2024) covers replacement of an existing water heater.
How many permits and filings does 11214 Crossland Dr have?
1 filing across 1 project, from September 30, 2024 to September 30, 2024.
Is there other construction near 11214 Crossland Dr?
Yes. Nearby filings include 11218 Crossland Dr (replacement of complete existing central heat and air system with or without duct work hvac change out, Jan 22, 2026); 10613 Beckwood Dr (express: replace siding on all sides of sfr, Jul 17, 2024); 10615 Beckwood Dr (at10615 beckwood dr austin tx 78726 we plan to install a new code-compliant in-ground irrigation system designed and supervised by a tceq-licensed irrigator (license li0030033). the system will connect to the city water supply with a tested dcv backflow preventer and a master valve and will be divided into properly sized zones for turf shrub beds and individual trees using a mix of high-efficiency mp rotors and drip emitters. pvc main and lateral lines will be buried to required depth wired through conduit. a wifi compatible controller with rain sensor will automatically adjust watering schedules to meet austin water conservation standards avoiding overspray and runoff. zone layout precipitation rates and run times are based on site hydraulics and plant needs and all components will be installed to meet or exceed city of austin and tceq irrigation rules. upon completion the system will be inspected the backflow device tested by a certified bpat tester and the homeowner instructed in controller operation and seasonal maintenance, Sep 24, 2025).
How do I get alerts for new permits at 11214 Crossland Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78726- 11218 Crossland DrJan 22, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 34 m away
- 10613 Beckwood DrJul 17, 2024Express: replace siding on all sides of sfr · 58 m away
- 10615 Beckwood DrSep 24, 2025At10615 beckwood dr austin tx 78726 we plan to install a new code-compliant in-ground irrigation system designed and supervised by a tceq-licensed irrigator (license li0030033). the system will connect to the city water supply with a tested dcv backflow preventer and a master valve and will be divided into properly sized zones for turf shrub beds and individual trees using a mix of high-efficiency mp rotors and drip emitters. pvc main and lateral lines will be buried to required depth wired through conduit. a wifi compatible controller with rain sensor will automatically adjust watering schedules to meet austin water conservation standards avoiding overspray and runoff. zone layout precipitation rates and run times are based on site hydraulics and plant needs and all components will be installed to meet or exceed city of austin and tceq irrigation rules. upon completion the system will be inspected the backflow device tested by a certified bpat tester and the homeowner instructed in controller operation and seasonal maintenance · 70 m away
- 11222 Crossland DrDec 27, 2023Replacement of an existing water heater · 73 m away
- 11206 Crossland DrDec 8, 2023Replacement of an existing water heater · 77 m away
- 11301 Nutwood CvDec 13, 2023Install roof mounted solar pv system the electric company is pec · 102 m away
- 10600 Queensbury CvDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 4 ton gas greenspeed horiz · 102 m away
- 11202 Crossland DrNov 6, 2026Install level 2 ev charger · 115 m away
- 11201 Andenwood DrApr 28, 2026Replacement of an existing water heater install a 40 gallon natural gas tall water heater · 116 m away
- 10600 Beckwood DrFeb 27, 2026Install gas line to pool heater · 118 m away
- 10510 Erica Leigh CtApr 29, 2024Brown - install new _5.4__kw rooftop solar system to existing residential only using (line side tap). utility company - __pec___ · 146 m away
- 10509 Erica Leigh CtDec 28, 2023We plan to install a 12.00 kw solar system + (2) enphase iq 5p batteries on the residential home. we also plan to conduct a main panel upgrade installing a 225 bus with 150 amp breaker. we will not require a disconnection of power on the home as the main meter combo is on the front yard and service panel is on the wall of home · 157 m away