12011 Wycliff Ln
Austin, TX 78727
Water-line reroute and 40-gallon water heater permitted
A plumbing permit at 12011 Wycliff Ln covers rerouting a leaking water line through the attic and installing a 40-gallon water heater. The City of Austin permit was filed on June 22, 2026, and is listed as final.
Summarized from City of Austin records · updated Jun 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 22, 2026
- since Jun 22, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled41-60 water reroute roadmap: water reroute(41/60) abandon the leaking water line & reroute it overhead in the attic. includes insulating & strapping rerouted water line & hydrostatic testing of the entire system after repairs. 40 gallon water heater install
- AppliedMay 19, 2026
- IssuedJun 22, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 25, 2026
Passed final inspection Jun 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project41-60 water reroute roadmap: water reroute(41/60) abandon the leaking water line & reroute it overhead in the attic. includes insulating & strapping rerouted water line & hydrostatic testing of the entire system after repairs. 40 gallon water heater install
41-60 water reroute roadmap: water reroute(41/60) abandon the leaking water line & reroute it overhead in the attic. includes insulating & strapping rerouted water line & hydrostatic testing of the entire system after repairs. 40 gallon water heater install
City of Austin permitPlumbing PermitFinal- Record
- 2026-063008 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12011 Wycliff Ln
What work is being done at 12011 Wycliff Ln?
A City of Austin plumbing permit covers rerouting a leaking water line through the attic and installing a 40-gallon water heater.
When was the plumbing permit filed for 12011 Wycliff Ln?
The permit was filed on June 22, 2026. It is listed as final.
What is permit 2026-063008 PP for?
Permit 2026-063008 PP covers rerouting a leaking water line, insulating and strapping the rerouted line, hydrostatic testing, and installing a 40-gallon water heater.
Is a new home being built at 12011 Wycliff Ln?
The record provided is for plumbing work, not new-home construction. It describes a water-line reroute and water-heater installation.
What does the permit say about the water line at 12011 Wycliff Ln?
It says the leaking water line will be abandoned and rerouted through the attic. The work includes insulating and strapping the line and hydrostatic testing the system after repairs.
Also being built nearby
All of 78727- 12009 Wycliff LnSep 16, 2026Replacement of complete existing central heat and air system with or without duct work · 23 m away
- 12012 Carmel Park LnJul 6, 2026Replacement of complete existing central heat and air system with or without duct work hvac replacement · 31 m away
- 12004 Wycliff LnJan 6, 2025Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 12005 Wycliff LnAug 12, 2024Install gas pipe for generator · 63 m away
- 12015 Carmel Park LnOct 12, 2026Express: non-structural interior remodel for like-for-like repairs and cosmetic finish upgrades throughout the 1st floor including flooring kitchen/bath finish refreshes drywall repairs and popcorn ceiling removal. separate trade permits to be pulled for associated plumbing electrical and mechanical repairs · 84 m away
- 4203 Balboa LnDec 31, 2024Gas test · 113 m away
- 12002 Carmel Park LnFeb 13, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 12000 Carmel Park LnDec 4, 2025Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 12005 Carmel Park LnJun 16, 2026Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 12021 Carmel Park LnNov 20, 2024Replacement of an existing water heater replace water heater · 144 m away
- 12022 Carmel Park LnMay 26, 2026We will replace the old split bus main panel that needs to be replaced because they are a known issue. we will upgrade the service to a 200 amp main breaker using 4/0 aluminum wire between the meter base and the panel. we will replace the meter base to meet austin energy requirements. we will add in surge protection two ground rods and bond the gas line and waterline to the main panel to meet current code · 149 m away
- 12010 Fremont CvSep 30, 2024Pool spa and new concrete deck · 150 m away