Power upgrade permitted at 12301 Antoinette Pl
A City of Austin electrical permit indicates that power at 12301 Antoinette Pl is being upgraded to 200 amps. Permit 2026-135256 EP was filed October 16, 2026, and is marked final; an earlier plumbing permit covered replacement of a 40-gallon natural-gas water heater.
Summarized from City of Austin records · updated Oct 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 16, 2026
- since Dec 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade power to 200a
- AppliedOct 14, 2026
- IssuedOct 16, 2026
- WorkOct '26 – Oct '26
- Final inspectionOct 23, 2026
Passed final inspection Oct 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsUpgrade power to 200a
Upgrade power to 200a
City of Austin permitElectrical PermitFinal- Record
- 2026-135256 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater 40 gallon (natural) gas water heater replacement
Replacement of an existing water heater 40 gallon (natural) gas water heater replacement
City of Austin permitPlumbing PermitFinal- Record
- 2024-159115 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12301 Antoinette Pl
What work is permitted at 12301 Antoinette Pl?
A City of Austin electrical permit describes an upgrade to 200-amp power service. The permit, 2026-135256 EP, was filed October 16, 2026.
When was the electrical permit filed for 12301 Antoinette Pl?
Permit 2026-135256 EP was filed October 16, 2026, and is marked final.
Is a new building being constructed at 12301 Antoinette Pl?
The listed City of Austin permits describe an electrical upgrade and a water-heater replacement, not construction of a new building.
Was a water heater replaced at 12301 Antoinette Pl?
A plumbing permit filed December 16, 2024, describes replacement of an existing 40-gallon natural-gas water heater. Permit 2024-159115 PP is marked final.
What is the status of permit 2026-135256 EP?
The City of Austin lists the electrical permit for the 200-amp power upgrade as final. It was filed October 16, 2026.
Also being built nearby
All of 78727- 12231 Antoinette PlNov 16, 2023Addition/remodel. addition of two bedrooms and one bathroom to second floor. conversion of a portion of existing garage into a laundry room and closet. conversion of a portion of existing covered front porch into enlarged entryway. comprehensive interior remodel. reconfigure interior layout. addition/remodel will result in a 4 bedroom 3 bathroom single family residence · 19 m away
- 12300 Antoinette PlMay 27, 2025Interior remodel: interior wall removals and modifications in kitchen/dining area structural modification to ceiling framing adding lvl beam creating office kitchen remodel moving sink and range · 51 m away
- 4409 Bouvet CtDec 15, 2023Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 12228 Antoinette PlMar 28, 2024Badum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps · 67 m away
- 4308 Charlemagne CtMay 30, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 12226 Antoinette PlOct 21, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 4313 Charlemagne CtMar 6, 2026(brower kyle) - installation of circuit for elec. vehicle charging station - esip · 92 m away
- 4306 Charlemagne CtJul 30, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 12223 Antoinette PlMar 10, 2026Upgrading exterior electrical service to 200amps · 105 m away
- 4403 Bouvet CtAug 5, 2026Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 12301 Wycliff LnOct 29, 2026Emporia pro nacs emporia vue energy monitor proposed installation plan: install a new 60a circuit in the 125a main service panel and route wiring through a surface-mounted conduit along the exterior wall to the left exterior side wall of the garage. hardwire the emporia pro nacs and configure to draw up to 48a continuous. additional installation notes: the emporia vue energy monitor is included with the emporia pro charger and must be installed inside the main service panel to monitor whole-home energy usage. install ct clamps and activate device in ap · 115 m away
- 4220 Dauphine DrFeb 23, 2026Upgrading existing 100a main service to a 200a main service - underground service · 134 m away