12228 Antoinette Pl
Austin, TX 78727
12228 Antoinette Pl: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12228 Antoinette Pl, Austin, TX 78727 since March 21, 2024. The most recent, filed March 28, 2024, covers: “Badum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps”.
Compiled from City of Austin records · updated Mar 28, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Mar 28, 2024
- since Mar 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBadum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
- AppliedMar 19, 2024
- IssuedMar 28, 2024
- WorkMar '24 – Sep '24
- Final inspectionSep 6, 2024
Passed final inspection Sep 6, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsBadum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
Badum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
City of Austin permitElectrical PermitFinal- Record
- 2024-034191 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Badum install new _5.4__kw rooftop solar system to existing residential only using backfed breaker
Badum install new _5.4__kw rooftop solar system to existing residential only using backfed breaker
City of Austin permitElectrical PermitFinal- Record
- 2024-033914 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12228 Antoinette Pl
What is being built at 12228 Antoinette Pl?
The latest filing (City of Austin permit 2024-034191 EP, March 28, 2024) covers badum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps.
How many permits and filings does 12228 Antoinette Pl have?
2 filings across 2 projects, from March 21, 2024 to March 28, 2024.
Is there other construction near 12228 Antoinette Pl?
Yes. Nearby filings include 12226 Antoinette Pl (replacement of complete existing central heat and air system with or without duct work, Oct 21, 2024); 12300 Antoinette Pl (interior remodel: interior wall removals and modifications in kitchen/dining area structural modification to ceiling framing adding lvl beam creating office kitchen remodel moving sink and range, May 27, 2025); 12301 Wycliff Ln (emporia pro nacs emporia vue energy monitor proposed installation plan: install a new 60a circuit in the 125a main service panel and route wiring through a surface-mounted conduit along the exterior wall to the left exterior side wall of the garage. hardwire the emporia pro nacs and configure to draw up to 48a continuous. additional installation notes: the emporia vue energy monitor is included with the emporia pro charger and must be installed inside the main service panel to monitor whole-home energy usage. install ct clamps and activate device in ap, Oct 29, 2026).
How do I get alerts for new permits at 12228 Antoinette Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 12226 Antoinette PlOct 21, 2024Replacement of complete existing central heat and air system with or without duct work · 17 m away
- 12300 Antoinette PlMay 27, 2025Interior remodel: interior wall removals and modifications in kitchen/dining area structural modification to ceiling framing adding lvl beam creating office kitchen remodel moving sink and range · 43 m away
- 12301 Wycliff LnOct 29, 2026Emporia pro nacs emporia vue energy monitor proposed installation plan: install a new 60a circuit in the 125a main service panel and route wiring through a surface-mounted conduit along the exterior wall to the left exterior side wall of the garage. hardwire the emporia pro nacs and configure to draw up to 48a continuous. additional installation notes: the emporia vue energy monitor is included with the emporia pro charger and must be installed inside the main service panel to monitor whole-home energy usage. install ct clamps and activate device in ap · 49 m away
- 12231 Antoinette PlNov 16, 2023Addition/remodel. addition of two bedrooms and one bathroom to second floor. conversion of a portion of existing garage into a laundry room and closet. conversion of a portion of existing covered front porch into enlarged entryway. comprehensive interior remodel. reconfigure interior layout. addition/remodel will result in a 4 bedroom 3 bathroom single family residence · 59 m away
- 12301 Antoinette PlOct 16, 2026Upgrade power to 200a · 67 m away
- 12223 Antoinette PlMar 10, 2026Upgrading exterior electrical service to 200amps · 79 m away
- 4220 Dauphine DrFeb 23, 2026Upgrading existing 100a main service to a 200a main service - underground service · 105 m away
- 4313 Charlemagne CtMar 6, 2026(brower kyle) - installation of circuit for elec. vehicle charging station - esip · 115 m away
- 4308 Kilgore LnFeb 26, 2025Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 4409 Bouvet CtDec 15, 2023Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 12220 Antoinette PlJun 19, 2026Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 4308 Charlemagne CtMay 30, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
More solar installs in 78727.