4308 Kilgore Ln
Austin, TX 78727
4308 Kilgore Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 4308 Kilgore Ln, Austin, TX 78727. The most recent, filed February 26, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Feb 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 26, 2025
- since Feb 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedFeb 14, 2025
- IssuedFeb 26, 2025
- WorkFeb '25 – Mar '25
- Final inspectionMar 14, 2025
Passed final inspection Mar 14, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-018364 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4308 Kilgore Ln
What is being built at 4308 Kilgore Ln?
The latest filing (City of Austin permit 2025-018364 MP, February 26, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 4308 Kilgore Ln have?
1 filing across 1 project, from February 26, 2025 to February 26, 2025.
Is there other construction near 4308 Kilgore Ln?
Yes. Nearby filings include 12210 Wycliff Ln (express - replace 1 window like for like, Nov 18, 2025); 12301 Wycliff Ln (emporia pro nacs emporia vue energy monitor proposed installation plan: install a new 60a circuit in the 125a main service panel and route wiring through a surface-mounted conduit along the exterior wall to the left exterior side wall of the garage. hardwire the emporia pro nacs and configure to draw up to 48a continuous. additional installation notes: the emporia vue energy monitor is included with the emporia pro charger and must be installed inside the main service panel to monitor whole-home energy usage. install ct clamps and activate device in ap, Oct 29, 2026); 12220 Antoinette Pl (replacement of complete existing central heat and air system with or without duct work, Jun 19, 2026).
How do I get alerts for new permits at 4308 Kilgore Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 12210 Wycliff LnNov 18, 2025Express - replace 1 window like for like · 69 m away
- 12301 Wycliff LnOct 29, 2026Emporia pro nacs emporia vue energy monitor proposed installation plan: install a new 60a circuit in the 125a main service panel and route wiring through a surface-mounted conduit along the exterior wall to the left exterior side wall of the garage. hardwire the emporia pro nacs and configure to draw up to 48a continuous. additional installation notes: the emporia vue energy monitor is included with the emporia pro charger and must be installed inside the main service panel to monitor whole-home energy usage. install ct clamps and activate device in ap · 85 m away
- 12220 Antoinette PlJun 19, 2026Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 4302 Everest LnOct 20, 2026Add gfci protected outlet for tankless water heater · 110 m away
- 12226 Antoinette PlOct 21, 2024Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 4209 Kilgore LnAug 4, 2025Replacement of an existing water heater permit for tankless conversion · 117 m away
- 12228 Antoinette PlMar 28, 2024Badum - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps · 125 m away
- 4220 Dauphine DrFeb 23, 2026Upgrading existing 100a main service to a 200a main service - underground service · 133 m away
- 12223 Antoinette PlMar 10, 2026Upgrading exterior electrical service to 200amps · 135 m away
- 12215 Arrowwood DrJun 25, 2025Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 4303 Everest LnSep 18, 2026Replacement of complete existing central heat and air system with or without duct work · 152 m away
- 12217 Arrowwood DrAug 13, 2025Replace tank water heater to tankless gas water heater · 159 m away