12601 Metric Boulevard
Austin, TX 78727 · Joash Management Services Llc.
Apex Dental Group tenant finish-out at 12601 Metric Boulevard
A 3,720-square-foot tenant finish-out for an Apex Dental Group dental office was registered on September 14, 2024, at 12601 Metric Boulevard in Austin. The TDLR record lists it as a renovation or alteration, with an applicant-estimated project cost of $175,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 14, 2024
- since Sep 14, 2024
- Largest scope
- 3,720 sf
- Estimated cost
- $175K
- state registration
Where this project stands
In state plan reviewAPEX DENTAL GROUP
3,720 sq ft · $175K est.
- RegisteredSep 14, 2024
- Plan reviewnow
- ConstructionOct '24 – Feb '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectTenant finish out for a dental office — apex dental group
TDLR project registrationRenovation/AlterationProject Registered3,720 sq ft$175K est.- Project #
- TABS2025001010
- Tenant / owner
- Apex Dental Group
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 12601 Metric Boulevard
What is being built at 12601 Metric Boulevard?
A TDLR registration describes a tenant finish-out for an Apex Dental Group dental office. It was registered on September 14, 2024.
Is a new dental office planned at 12601 Metric Boulevard in Austin?
The record indicates a dental-office tenant finish-out for Apex Dental Group. It does not state when the office will open.
How large is the Apex Dental Group project at 12601 Metric Boulevard?
The registered project covers 3,720 square feet.
How much will the Apex Dental Group project cost?
The TDLR registration lists an applicant-estimated project cost of $175,000. This is an estimate, not a confirmed final cost.
When was the project at 12601 Metric Boulevard registered?
The TDLR project registration, TABS2025001010, is dated September 14, 2024.
Is the project at 12601 Metric Boulevard new construction?
The TDLR record classifies it as a renovation or alteration and describes a tenant finish-out, not new construction.
Also being built nearby
All of 78727- 1749 Dapplegrey LnApr 11, 2024Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 1745 Dapplegrey LnNov 15, 2023Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 1701 Scofield LnSep 18, 2009Scofield montessori school · 72 m away
- 12704 Yearling CvJul 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system · 74 m away
- 12708 Yearling CvMay 8, 2026Express: replacing 3 windows like for like · 96 m away
- 1736 Dapplegrey LnSep 20, 2024Express: window replacement (20 windows like for like) · 112 m away
- 12712 Yearling CvJul 6, 2024Replacement of an existing water heater · 117 m away
- 1821 Dapplegrey LnNov 13, 2025Express - removing and replacing 4 windows 1 exterior door · 122 m away
- 1812 Dapplegrey LnMay 8, 2024Request to disconnect replace rodent damaged load side conductors · 124 m away
- 1732 Dapplegrey LnAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 1729 Dapplegrey LnJul 31, 2026Installation of gm energy v2h (vehicle-to-home) charging system. per guidance from stuart prior at ae we need to submit this interconnection application with inspection from ae under an aux power electrical permit because the hardware involves a ul 1741 grid-interactive device. ae wants to test the v2h functionality at final inspection to ensure effective isolation from the grid. gm energy home hub to be powered by 125a breaker placed in existing main electric panel. gm energy powershift bidirectional charger to be hardwired to a 60a breaker placed in home hub. designated backed-up loads for v2h during grid outage: 50a subpanel. all other loads will be non-backed-up · 126 m away
- 12601 Metric BlvdNov 25, 2024Tenant finish out for dental office · 136 m away