groundranger
Recent · latest filing Aug 2026Residential

1910 Crystal Shore Dr

Austin, TX 78728

Electrical panel work at 1910 Crystal Shore Dr

Electrical permits at 1910 Crystal Shore Dr record a main-panel replacement on October 23, 2025, and later electrical work on August 14, 2026. The permits describe replacing the panel like for like, then changing the meter-to-panel jumpers and reducing the main breaker from 150 amps to 125 amps.

Summarized from City of Austin records · updated Aug 14, 2026

Projects
2
2 filings
Latest filing
Aug 14, 2026
since Oct 23, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Change jumpers from meter to main panel. change main breaker to 125a frin 150a

  1. AppliedAug 5, 2026
  2. IssuedAug 14, 2026
  3. WorkAug '26 – Aug '26
  4. Final inspectionAug 28, 2026

Passed final inspection Aug 28, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Change jumpers from meter to main panel. change main breaker to 125a frin 150a

    Change jumpers from meter to main panel. change main breaker to 125a frin 150a

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect emergency replacement of main panel - like for like

    Disconnect/reconnect emergency replacement of main panel - like for like

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1910 Crystal Shore Dr

What is happening at 1910 Crystal Shore Dr in Austin?

City of Austin permits record residential electrical work, including a main-panel replacement and later changes to the electrical service. They do not describe a new building.

Is a new house being built at 1910 Crystal Shore Dr?

The records provided do not list new home construction. They show two electrical permits for work at the address.

When was the electrical work permitted at 1910 Crystal Shore Dr?

The permits were filed on October 23, 2025 (2025-136832 EP) and August 14, 2026 (2026-101434 EP).

What electrical work does permit 2025-136832 EP describe?

The October 23, 2025 permit describes disconnecting and reconnecting service for an emergency, like-for-like replacement of the main panel.

What work does permit 2026-101434 EP describe?

The August 14, 2026 permit describes changing the jumpers from the meter to the main panel and changing the main breaker from 150 amps to 125 amps.

Are the electrical permits at 1910 Crystal Shore Dr final?

Both permits, 2025-136832 EP and 2026-101434 EP, are listed with final status.

Also being built nearby

All of 78728
Email me when a new permit is filed