2023 Cervin Blvd
Austin, TX 78728
2023 Cervin Blvd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2023 Cervin Blvd, Austin, TX 78728 since January 3, 2025. The most recent, filed January 10, 2025, covers: “Disconnect/reconnect no meter work done *add to: 2024-165179 ep* new 200a main service panel”.
Compiled from City of Austin records · updated Jan 10, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jan 10, 2025
- since Jan 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledDisconnect/reconnect no meter work done *add to: 2024-165179 ep* new 200a main service panel
- AppliedJan 3, 2025
- IssuedJan 10, 2025
- WorkJan '25 – Jan '25
- Final inspectionJan 27, 2025
Passed final inspection Jan 27, 2025.
1 contact on this project
Permit & project history
2 projectsDisconnect/reconnect no meter work done *add to: 2024-165179 ep* new 200a main service panel
Disconnect/reconnect no meter work done *add to: 2024-165179 ep* new 200a main service panel
City of Austin permitElectrical PermitFinal- Record
- 2025-000925 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install 8 (415w) roof mounted solar panels 3.320 kw solar service system tying into a new 200 amp rated msp
Install 8 (415w) roof mounted solar panels 3.320 kw solar service system tying into a new 200 amp rated msp
City of Austin permitElectrical PermitFinal- Record
- 2024-165179 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2023 Cervin Blvd
What is being built at 2023 Cervin Blvd?
The latest filing (City of Austin permit 2025-000925 EP, January 10, 2025) covers disconnect/reconnect no meter work done *add to: 2024-165179 ep* new 200a main service panel.
How many permits and filings does 2023 Cervin Blvd have?
2 filings across 2 projects, from January 3, 2025 to January 10, 2025.
Is there other construction near 2023 Cervin Blvd?
Yes. Nearby filings include 2019 Cervin Blvd (replacement of an existing water heater, Jan 31, 2024); 2104 Cervin Blvd (200 amp service upgrade, Sep 9, 2025); 2106 Klattenhoff Dr (wells branch park improvements phase ia, Mar 2, 2007).
How do I get alerts for new permits at 2023 Cervin Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78728- 2019 Cervin BlvdJan 31, 2024Replacement of an existing water heater · 37 m away
- 2104 Cervin BlvdSep 9, 2025200 amp service upgrade · 144 m away
- 2106 Klattenhoff DrMar 2, 2007Wells branch park improvements phase ia · 167 m away
- 2123 Cervin BlvdJan 7, 2025Upgrade of underground services to repair the broken neutral and the existing main panel · 220 m away
- 2003 Surrender AveNov 29, 202340g gas water heater install · 244 m away
- 1910 Crystal Shore DrAug 14, 2026Change jumpers from meter to main panel. change main breaker to 125a frin 150a · 248 m away
- 2008 Surrender AveApr 7, 2026Move service 200 amp · 277 m away
- 2011 Klattenhoff DrMar 10, 2025Electrical upgrade - new electrical panel with main breaker all new branch circuit breakers a new meter to comply with local code and to handle customer electrical load · 288 m away
- 14909 Alpha Collier DrApr 1, 2024***emergency*** replace meter base and riser only (overhead 200 amp meter base / 150 amp main panel existing) (lost phase inside meter base) · 305 m away
- 2011 Surrender AveJan 11, 2024Replacement of an existing water heater · 307 m away
- 14913 Alpha Collier DrNov 29, 2025Upgrade existing electrical service to 200 amps · 316 m away
- 2205 Quiet Wood DrDec 16, 2023Emergency repair meter can is being pulled off house and conductors are coming into contact with metal on meter can · 331 m away
More solar installs in 78728.