10125 Lake Creek Pkwy
Austin, TX 78729
10125 Lake Creek Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 10125 Lake Creek Pkwy, Austin, TX 78729. The most recent, filed March 2, 2007, covers: “Davis & davis denistry clinic”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 10125 Lake Creek Pkwy
What is being built at 10125 Lake Creek Pkwy?
The latest filing (City of Austin case 257344, March 2, 2007) covers davis & davis denistry clinic.
How many permits and filings does 10125 Lake Creek Pkwy have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 10125 Lake Creek Pkwy?
Yes. Nearby filings include 10127 Lake Creek Pkwy (lake creek montessori, Oct 6, 2023); 10121 Lake Creek Pkwy (lake creek professional center (doctors office), Dec 15, 2009); 10119 Lake Creek Pkwy (lake creek professionals, Mar 2, 2007).
How do I get alerts for new permits at 10125 Lake Creek Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 10127 Lake Creek PkwyOct 6, 2023Lake creek montessori · 26 m away
- 10121 Lake Creek PkwyDec 15, 2009Lake creek professional center (doctors office) · 70 m away
- 10119 Lake Creek PkwyMar 2, 2007Lake creek professionals · 101 m away
- 13000 Hymeadow DrMar 2, 2007Barrier free housing · 129 m away
- 13032 Hymeadow DrOct 16, 2022Lake creek garden bar-lounge facility s.p · 154 m away
- 13001 Hymeadow DrFeb 9, 2024Install level 2 ev charger per austin energys plugin rebate guidelines · 177 m away
- 10204 Lake Creek PkwyMar 2, 2007Goodyear tire center · 180 m away
- 10203 Lake Creek PkwyJul 14, 2026Magic plumbing atx / magic mechanical llc will remove existing grease interceptors and install new 1000-gallon traffic-rated grease interceptors at the approved project locations. work includes: 811 utility locates prior to excavation. pumping and cleaning existing grease interceptors. excavation to expose and remove existing grease interceptors. disposal of existing grease interceptors in accordance with applicable regulations. preparation and compaction of subgrade for new installation. installation of new 1000-gallon traffic-rated grease interceptors. installation of new inlet and outlet sanitary sewer piping. installation of new cleanouts and required inspection manholes. connection of grease interceptor to existing sanitary sewer system. bedding backfill and compaction around new installation. leak testing and inspection of installed piping. restoration of trench areas to a safe condition pending final surface restoration. coordination of all required plumbing inspections with the city of austin. all work to be performed in accordance with the currently adopted city of austin plumbing code international plumbing code (ipc) as adopted and all applicable local regulations. project location(s) 4961 w us highway 290 austin tx 1418 e. anderson lane austin tx 78752 10203 lake creek parkway austin tx work description commercial plumbing work consisting of the replacement of existing grease interceptors with new traffic-rated 1000-gallon grease interceptors including associated excavation sanitary sewer piping modifications cleanouts inspection manholes testing and inspection · 201 m away
- 13033-1/2 Hymeadow DrMar 8, 2010Lake creek park subdivision · 212 m away
- 12901-1/2 Hymeadow DrOct 20, 2009Lake creek park subdivision · 215 m away
- 13000 Hymeadow CirJul 19, 2024Repaired prv in yard · 216 m away
- 13785 N US 183 Hwy Svrd NbAug 13, 2024Replace 1/2 rpz backflow device for slurpee machine located on wall behind slurpee machine · 230 m away