10204 Lake Creek Pkwy
Austin, TX 78729
10204 Lake Creek Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 10204 Lake Creek Pkwy, Austin, TX 78729. The most recent, filed March 2, 2007, covers: “Goodyear tire center”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 10204 Lake Creek Pkwy
What is being built at 10204 Lake Creek Pkwy?
The latest filing (City of Austin case 153701, March 2, 2007) covers goodyear tire center.
How many permits and filings does 10204 Lake Creek Pkwy have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 10204 Lake Creek Pkwy?
Yes. Nearby filings include 13785 N US 183 Hwy Svrd Nb (replace 1/2 rpz backflow device for slurpee machine located on wall behind slurpee machine, Aug 13, 2024); 13785 US 183 Hwy Svrd (the park at aspen lake (aka tower of the hills), Oct 16, 2008); 10203 Lake Creek Pkwy (magic plumbing atx / magic mechanical llc will remove existing grease interceptors and install new 1000-gallon traffic-rated grease interceptors at the approved project locations. work includes: 811 utility locates prior to excavation. pumping and cleaning existing grease interceptors. excavation to expose and remove existing grease interceptors. disposal of existing grease interceptors in accordance with applicable regulations. preparation and compaction of subgrade for new installation. installation of new 1000-gallon traffic-rated grease interceptors. installation of new inlet and outlet sanitary sewer piping. installation of new cleanouts and required inspection manholes. connection of grease interceptor to existing sanitary sewer system. bedding backfill and compaction around new installation. leak testing and inspection of installed piping. restoration of trench areas to a safe condition pending final surface restoration. coordination of all required plumbing inspections with the city of austin. all work to be performed in accordance with the currently adopted city of austin plumbing code international plumbing code (ipc) as adopted and all applicable local regulations. project location(s) 4961 w us highway 290 austin tx 1418 e. anderson lane austin tx 78752 10203 lake creek parkway austin tx work description commercial plumbing work consisting of the replacement of existing grease interceptors with new traffic-rated 1000-gallon grease interceptors including associated excavation sanitary sewer piping modifications cleanouts inspection manholes testing and inspection, Jul 14, 2026).
How do I get alerts for new permits at 10204 Lake Creek Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 13785 N US 183 Hwy Svrd NbAug 13, 2024Replace 1/2 rpz backflow device for slurpee machine located on wall behind slurpee machine · 58 m away
- 13785 US 183 Hwy SvrdOct 16, 2008The park at aspen lake (aka tower of the hills) · 58 m away
- 10203 Lake Creek PkwyJul 14, 2026Magic plumbing atx / magic mechanical llc will remove existing grease interceptors and install new 1000-gallon traffic-rated grease interceptors at the approved project locations. work includes: 811 utility locates prior to excavation. pumping and cleaning existing grease interceptors. excavation to expose and remove existing grease interceptors. disposal of existing grease interceptors in accordance with applicable regulations. preparation and compaction of subgrade for new installation. installation of new 1000-gallon traffic-rated grease interceptors. installation of new inlet and outlet sanitary sewer piping. installation of new cleanouts and required inspection manholes. connection of grease interceptor to existing sanitary sewer system. bedding backfill and compaction around new installation. leak testing and inspection of installed piping. restoration of trench areas to a safe condition pending final surface restoration. coordination of all required plumbing inspections with the city of austin. all work to be performed in accordance with the currently adopted city of austin plumbing code international plumbing code (ipc) as adopted and all applicable local regulations. project location(s) 4961 w us highway 290 austin tx 1418 e. anderson lane austin tx 78752 10203 lake creek parkway austin tx work description commercial plumbing work consisting of the replacement of existing grease interceptors with new traffic-rated 1000-gallon grease interceptors including associated excavation sanitary sewer piping modifications cleanouts inspection manholes testing and inspection · 145 m away
- 13781 US 183 Hwy SvrdMar 2, 2007Jiffy lube · 147 m away
- 10127 Lake Creek PkwyOct 6, 2023Lake creek montessori · 164 m away
- 10125 Lake Creek PkwyMar 2, 2007Davis & davis denistry clinic · 180 m away
- 10124 Lake Creek PkwyJan 21, 2022Aspen lake two -revision 1 · 181 m away
- 10207 Lake Creek PkwyOct 4, 2024Replace 1/2 rpz backflow preventer · 192 m away
- 13805 US 183 Hwy SvrdMar 15, 2014Park at aspen lake block a lot 1; resubdivision · 201 m away
- 13805 N US 183 Hwy Svrd NbJan 2, 2024Complete tear off and overlaying with 60 mil tpo · 201 m away
- 13809 US 183 Hwy SvrdApr 21, 2009Tower of the hills — tower of the hills · 227 m away
- 13809 N US 183 Hwy Svrd NbJul 22, 2026Replacement of any self-contained packaged units install one (1) chiller replacement like for like- unit #1000- tower of hills · 227 m away