13781 US 183 Hwy Svrd
Austin, TX 78729
13781 US 183 Hwy Svrd: 1 project on record
City of Austin lists 1 filing across 1 project at 13781 US 183 Hwy Svrd, Austin, TX 78729. The most recent, filed March 2, 2007, covers: “Jiffy lube”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 13781 US 183 Hwy Svrd
What is being built at 13781 US 183 Hwy Svrd?
The latest filing (City of Austin case 154165, March 2, 2007) covers jiffy lube.
How many permits and filings does 13781 US 183 Hwy Svrd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
What is being built near Lake Creek Parkway Market in Austin?
13781 US 183 Hwy Svrd is about 191 m from Lake Creek Parkway Market (10313 Lake Creek Parkway). Its latest filing is for jiffy lube.
Is there other construction near 13781 US 183 Hwy Svrd?
Yes. Nearby filings include 13785 US 183 Hwy Svrd (the park at aspen lake (aka tower of the hills), Oct 16, 2008); 13785 N US 183 Hwy Svrd Nb (replace 1/2 rpz backflow device for slurpee machine located on wall behind slurpee machine, Aug 13, 2024); 10207 Lake Creek Pkwy (replace 1/2 rpz backflow preventer, Oct 4, 2024).
How do I get alerts for new permits at 13781 US 183 Hwy Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 13785 US 183 Hwy SvrdOct 16, 2008The park at aspen lake (aka tower of the hills) · 93 m away
- 13785 N US 183 Hwy Svrd NbAug 13, 2024Replace 1/2 rpz backflow device for slurpee machine located on wall behind slurpee machine · 93 m away
- 10207 Lake Creek PkwyOct 4, 2024Replace 1/2 rpz backflow preventer · 129 m away
- 10203 Lake Creek PkwyJul 14, 2026Magic plumbing atx / magic mechanical llc will remove existing grease interceptors and install new 1000-gallon traffic-rated grease interceptors at the approved project locations. work includes: 811 utility locates prior to excavation. pumping and cleaning existing grease interceptors. excavation to expose and remove existing grease interceptors. disposal of existing grease interceptors in accordance with applicable regulations. preparation and compaction of subgrade for new installation. installation of new 1000-gallon traffic-rated grease interceptors. installation of new inlet and outlet sanitary sewer piping. installation of new cleanouts and required inspection manholes. connection of grease interceptor to existing sanitary sewer system. bedding backfill and compaction around new installation. leak testing and inspection of installed piping. restoration of trench areas to a safe condition pending final surface restoration. coordination of all required plumbing inspections with the city of austin. all work to be performed in accordance with the currently adopted city of austin plumbing code international plumbing code (ipc) as adopted and all applicable local regulations. project location(s) 4961 w us highway 290 austin tx 1418 e. anderson lane austin tx 78752 10203 lake creek parkway austin tx work description commercial plumbing work consisting of the replacement of existing grease interceptors with new traffic-rated 1000-gallon grease interceptors including associated excavation sanitary sewer piping modifications cleanouts inspection manholes testing and inspection · 130 m away
- 10204 Lake Creek PkwyMar 2, 2007Goodyear tire center · 147 m away
- 13805 N US 183 Hwy Svrd NbJan 2, 2024Complete tear off and overlaying with 60 mil tpo · 163 m away
- 13805 US 183 Hwy SvrdMar 15, 2014Park at aspen lake block a lot 1; resubdivision · 163 m away
- 10313 Lake Creek Parkway · Lake Creek Parkway MarketSep 23, 2026Lake creek parkway market — new construction — convenience store · 191 m away
- 13770 US 183 Hwy SvrdMay 3, 2016Burger stand 183 & lake creek parkway · 193 m away
- 13749 N US 183 Hwy Svrd NbSep 25, 2026Replacement of any self-contained packaged units replace (1) trane 6 ton gas rtu (rtu-1) north end (1) trane 4 ton gas rtu (rtu-2) core of branch and (1) trane 7.5 ton electric heat rtu (rtu-3) south end · 199 m away
- 13809 US 183 Hwy SvrdApr 21, 2009Tower of the hills — tower of the hills · 219 m away
- 13809 N US 183 Hwy Svrd NbJul 22, 2026Replacement of any self-contained packaged units install one (1) chiller replacement like for like- unit #1000- tower of hills · 219 m away