groundranger
Recent · latest filing Jul 2025Residential

13301 Amasia Dr

Austin, TX 78729

Austin home permitted for a 7.08 kVA energy storage system

Permits indicate a 7.08 kVA energy storage system is being installed at this existing residence, with a separate permit for connecting photovoltaic and energy storage components. Both permits were filed July 22, 2025; an earlier permit, filed October 23, 2023, covered a 10.9 kW rooftop solar system.

Summarized from City of Austin records · updated Jul 22, 2025

Projects
3
3 filings
Latest filing
Jul 22, 2025
since Jul 22, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

  1. AppliedJul 21, 2025
  2. IssuedJul 22, 2025
  3. WorkJul '25 – Dec '25
  4. Final inspectionDec 18, 2025

Passed final inspection Dec 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 7.08 kva energy storage system for existing residential only

    Install new 7.08 kva energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install new 10.9kw rooftop solar system for existing residential only

    Install new 10.9kw rooftop solar system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 13301 Amasia Dr

What is being built at 13301 Amasia Dr?

City of Austin permits indicate a 7.08 kVA energy storage system is being installed at the existing residence. A related permit covers connecting photovoltaic and energy storage components.

Is there a new solar system going in at 13301 Amasia Dr?

A permit filed October 23, 2023, covered a 10.9 kW rooftop solar system for the existing residence. The July 2025 permits cover an energy storage system and its connection.

When were the energy storage permits filed?

The City of Austin filed permits 2025-090670 EP and 2025-090680 EP on July 22, 2025. Both are listed as final.

What does permit 2025-090670 EP cover?

The July 22, 2025, electrical permit covers installation of a new 7.08 kVA energy storage system for the existing residence. Its status is listed as final.

What does permit 2025-090680 EP cover?

The July 22, 2025, electrical permit covers disconnecting and reconnecting equipment to tie in photovoltaic and energy storage components. The permit description says the service and meter sizes are not being upgraded.

Also being built nearby

All of 78729

More warehouses & industrial in 78729, solar installs in 78729.

Email me when a new permit is filed