7804 Jenner Cv
Austin, TX 78729
Main and sub electrical panels replaced at 7804 Jenner Cv
A City of Austin electrical permit covers replacement of the main and sub panels at 7804 Jenner Cv. The permit was filed May 8, 2026, and its status is Final.
Summarized from City of Austin records · updated May 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2026
- since May 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMain and sub panel replacement
- AppliedMay 4, 2026
- IssuedMay 8, 2026
- WorkMay '26 – May '26
- Final inspectionMay 13, 2026
Passed final inspection May 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectMain and sub panel replacement
Main and sub panel replacement
City of Austin permitElectrical PermitFinal- Record
- 2026-055004 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7804 Jenner Cv
What work was permitted at 7804 Jenner Cv?
A City of Austin electrical permit covers replacement of the main and sub panels. Permit 2026-055004 EP was filed May 8, 2026.
When was the electrical permit filed for 7804 Jenner Cv?
The permit was filed May 8, 2026. Its status is Final.
What is permit 2026-055004 EP for?
It is for replacing the main and sub electrical panels at 7804 Jenner Cv in Austin.
Is new construction planned at 7804 Jenner Cv?
The available City of Austin record is an electrical permit for main and sub panel replacement, not a new-construction permit.
What is the status of the 7804 Jenner Cv permit?
Permit 2026-055004 EP is listed as Final. It covers main and sub panel replacement.
Also being built nearby
All of 78729- 7806 Jenner CvMar 21, 2024Run buried gas line from meter to generator · 23 m away
- 13215 Jenner LnOct 16, 2024Main service replace with new 200 amp meter and panel. add ev charger · 168 m away
- 13303 Tamayo DrDec 10, 2024Etj - upgrade meter loop to 200 amp including meter socket & riser. replace main panel with like for like · 177 m away
- 13119 Boomer LnSep 6, 2024Ae disconnect/reconnect of service required to install generator etj · 203 m away
- 13202 Darwin LnJan 24, 2024Installing a new gas line · 212 m away
- 13301 Amasia DrJul 22, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 231 m away
- 13204 Vendrell DrMar 12, 2026Replacement of an existing water heater · 246 m away
- 13116 Bidwell DrMay 12, 2025200amp ug service build · 265 m away
- 8100 Hendricks DrSep 9, 2026Etj zone upgrade and update underground electrical service from existing size and condition to a 200 amp with main breaker (per ae requested repairs) · 267 m away
- 13205 Vendrell DrJan 15, 2026100 to 200 amp meter and panel upgrade with grounding [etj] · 294 m away
- 7909 Snook Hook TrlFeb 12, 2024Upgrading 125 amp service like for like · 294 m away
- 7916 Taranto DrSep 9, 2024Repaired the outside gas line to the pool heater · 296 m away