Pond Springs Elementary renovation registered in September 2026
A renovation at Pond Springs Elementary, 7825 Elkhorn Mountain Trail, was registered with the Texas Department of Licensing and Regulation on September 9, 2026. The listed work includes replacing interior flooring and plumbing fixtures, addressing exterior drainage, replacing two storefront windows and maintaining the building envelope; no additional square footage is planned.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2026
- since Sep 9, 2026
- Largest scope
- 70,000 sf
- Estimated cost
- $3.6M
- state registration
Where this project stands
Approved · construction starts Jun 1, 2027Pond Springs Elementary
70,000 sq ft · $3.6M est.
- RegisteredSep 9, 2026
- Plan review
- ConstructionJun '27 – Sep '28
- Inspected
- Closed
A 15-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplace interior flooring, replace plumbing fixtures, address exterior drainage issues, replace two storefront windows, exterior envelope maintenance, 70,000 sq ft no additional square footage. — pond springs elementary school
TDLR project registrationRenovation/AlterationReview Complete70,000 sq ft$3.6M est.- Project #
- TABS2027000638
- Tenant / owner
- Pond Springs Elementary
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7825 Elkhorn Mountain Trail
What is happening at 7825 Elkhorn Mountain Trail in Austin?
Pond Springs Elementary is slated for renovation work, according to TDLR registration TABS2027000638, filed September 9, 2026. The work includes interior and exterior maintenance.
What work is planned at Pond Springs Elementary?
The registration lists new interior flooring and plumbing fixtures, exterior drainage work, replacement of two storefront windows and exterior envelope maintenance.
When was the Pond Springs Elementary renovation registered?
The Texas Department of Licensing and Regulation registration was filed September 9, 2026. Its status is listed as Review Complete.
How much will the Pond Springs Elementary project cost?
The TDLR registration lists an applicant-estimated project cost of $3.6 million.
How large is the Pond Springs Elementary renovation?
The registration lists 70,000 square feet of work and says no additional square footage will be added.
Is a new school being built at 7825 Elkhorn Mountain Trail?
The record describes a renovation and alteration at Pond Springs Elementary, not a new school building. It states that no additional square footage is planned.
Also being built nearby
All of 78729- 7807 Elkhorn Mountain TrlOct 29, 2025Express- replacing windows like for like no structural change · 18 m away
- 7801 Elkhorn Mountain TrlNov 11, 2024Ev charger install · 57 m away
- 8002 Tantara CtJul 27, 2026Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 8009 Tantara CtAug 21, 2024Replacement of an existing water heater · 94 m away
- 12904 Partridge Bend DrDec 29, 2023Replacement of an existing water heater · 95 m away
- 12717 Tantara DrJan 30, 2025Heat pump replacement · 114 m away
- 7721 Elkhorn Mountain TrlSep 9, 2024Coa has requested homeowner to pull electrical permit to proceed with electrical of greenhouse we will be adding service outlets for greenhouse providing a dedicated circuit for this area no electrical work to be performed to the existing electrical panel · 126 m away
- 7825 Elkhorn Mountain TrlAug 11, 2026Re roofing project. sbs and metal panel · 126 m away
- 12709 Tantara DrFeb 26, 2024The existing main service panel has a supply side bus with 6 handles. we need to add a pv breaker but this would break the 6 handle rule. we need to add a 100a main breaker to change it to a load side bus to add a load side breaker for interconnection · 132 m away
- 7720 Elkhorn Mountain TrlSep 26, 2024Install 40 gal water heater · 135 m away
- 7822 Elkhorn Mountain TrlAug 7, 2026Replacement of an existing water heater · 141 m away
- 8014 Tantara CtJan 27, 2025Replacement of an existing water heater · 144 m away