8009 Tantara Ct
Austin, TX 78729
8009 Tantara Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 8009 Tantara Ct, Austin, TX 78729. The most recent, filed August 21, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Aug 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 21, 2024
- since Aug 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedJul 8, 2024
- IssuedAug 21, 2024
- WorkAug '24 – Oct '24
- Final inspectionOct 11, 2024
Passed final inspection Oct 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-084431 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8009 Tantara Ct
What is being built at 8009 Tantara Ct?
The latest filing (City of Austin permit 2024-084431 PP, August 21, 2024) covers replacement of an existing water heater.
How many permits and filings does 8009 Tantara Ct have?
1 filing across 1 project, from August 21, 2024 to August 21, 2024.
What is being built near Round Rock Independent School District in Austin?
8009 Tantara Ct is about 94 m from Round Rock Independent School District (7825 Elkhorn Mountain Trail). Its latest filing is for replacement of an existing water heater.
Is there other construction near 8009 Tantara Ct?
Yes. Nearby filings include 12717 Tantara Dr (heat pump replacement, Jan 30, 2025); 8014 Tantara Ct (replacement of an existing water heater, Jan 27, 2025); 8002 Tantara Ct (replacement of complete existing central heat and air system with or without duct work, Jul 27, 2026).
How do I get alerts for new permits at 8009 Tantara Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 12717 Tantara DrJan 30, 2025Heat pump replacement · 36 m away
- 8014 Tantara CtJan 27, 2025Replacement of an existing water heater · 59 m away
- 8002 Tantara CtJul 27, 2026Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 7825 Elkhorn Mountain Trail · Round Rock Independent School DistrictSep 9, 2026Pond springs elementary — renovation/alteration — replace interior flooring, replace plumbing fixtures, address exterior drainage issues, replace two storefront windows, exterior envelope maintenance, 70,000 sq ft no additional square footage · 94 m away
- 8109 Tallyho TrlJan 12, 2026Replacing 50 feet of 1 inch water line from the water meter to the house due to a water leak · 93 m away
- 12709 Tantara DrFeb 26, 2024The existing main service panel has a supply side bus with 6 handles. we need to add a pv breaker but this would break the 6 handle rule. we need to add a 100a main breaker to change it to a load side bus to add a load side breaker for interconnection · 96 m away
- 12802 Tantara DrDec 13, 2023Relocate and replace prv · 100 m away
- 7807 Elkhorn Mountain TrlOct 29, 2025Express- replacing windows like for like no structural change · 111 m away
- 12806 Tantara DrApr 5, 2024Install evse · 124 m away
- 12712 Tantara DrNov 6, 2026Express: replace 18 windows and 1 sliding pation door like for like · 137 m away
- 7822 Elkhorn Mountain TrlAug 7, 2026Replacement of an existing water heater · 137 m away
- 7801 Elkhorn Mountain TrlNov 11, 2024Ev charger install · 140 m away