groundranger
Recent · latest filing Jan 2026Residential

8109 Tallyho Trl

Austin, TX 78729

Water and sewer line repairs at 8109 Tallyho Trl

City of Austin permits show plumbing repairs at the residence at 8109 Tallyho Trl, rather than a new building project. A sewer-line repair permit was filed January 23, 2025, and a water-line replacement permit was filed January 12, 2026; the water-line permit is expired.

Summarized from City of Austin records · updated Jan 12, 2026

Projects
2
2 filings
Latest filing
Jan 12, 2026
since Jan 23, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Replacing 50 feet of 1 inch water line from the water meter to the house due to a water leak

  1. AppliedJan 10, 2026
  2. IssuedJan 12, 2026
  3. !WorkJan '26 – Jul '26
  4. Final inspection

Marked expired Jul 16, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacing 50 feet of 1 inch water line from the water meter to the house due to a water leak

    Replacing 50 feet of 1 inch water line from the water meter to the house due to a water leak

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 18 ft tunnel to repair sewer line. access in front right side

    18 ft tunnel to repair sewer line. access in front right side

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8109 Tallyho Trl

What is being built at 8109 Tallyho Trl?

The City of Austin records list plumbing repairs at the residence, not a new building project. The work includes sewer-line and water-line repairs.

What plumbing work was permitted at 8109 Tallyho Trl?

A January 23, 2025, permit covered an 18-foot tunnel to repair the sewer line. A January 12, 2026, permit covered replacing 50 feet of water line from the meter to the house.

When was the sewer repair permit filed at 8109 Tallyho Trl?

The City of Austin filed permit 2025-005928 PP on January 23, 2025. The permit status is Final.

Is the water-line repair permit at 8109 Tallyho Trl still active?

No. The City of Austin lists permit 2026-003394 PP, filed January 12, 2026, as Expired.

Why was the water line being replaced at 8109 Tallyho Trl?

The permit description says 50 feet of 1-inch water line was being replaced from the water meter to the house due to a water leak.

What work is happening near Round Rock Independent School District?

City of Austin permit records show sewer- and water-line repairs at 8109 Tallyho Trl, about 150 meters from Round Rock Independent School District at 7825 Elkhorn Mountain Trail.

Also being built nearby

All of 78729
Email me when a new permit is filed