EV charger circuit and backup battery permits at 3608 Atlas Cv
Electrical permits at 3608 Atlas Cv cover a 60-amp dedicated circuit for a hardwired EV charger, plus a backup battery system and an additional meter socket. The battery-system permit was filed July 29, 2026, and the EV charger circuit permit was filed September 15, 2026; both are listed as final.
Summarized from City of Austin records · updated Sep 15, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 15, 2026
- since Jul 29, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall a 60-amp dedicated circuit for a hardwired ev charger
- AppliedSep 14, 2026
- IssuedSep 15, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 16, 2026
Passed final inspection Oct 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall a 60-amp dedicated circuit for a hardwired ev charger
Install a 60-amp dedicated circuit for a hardwired ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-120324 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Base: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-092072 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3608 Atlas Cv
What work is permitted at 3608 Atlas Cv?
Austin permits cover a backup battery system and an additional meter socket, as well as a 60-amp dedicated circuit for a hardwired EV charger.
Is an EV charger being installed at 3608 Atlas Cv?
A September 15, 2026 electrical permit describes installing a 60-amp dedicated circuit for a hardwired EV charger. The permit is listed as final.
Is a home battery system being added at 3608 Atlas Cv?
A July 29, 2026 permit describes installing a backup battery system and an additional meter socket. It is listed as final.
When were the permits filed for 3608 Atlas Cv?
The backup battery system permit, 2026-092072 EP, was filed July 29, 2026. The EV charger circuit permit, 2026-120324 EP, was filed September 15, 2026.
What are the permit numbers for 3608 Atlas Cv?
The backup battery system and additional meter socket are listed under permit 2026-092072 EP. The 60-amp EV charger circuit is listed under permit 2026-120324 EP.
Are the electrical permits at 3608 Atlas Cv final?
Yes. Both Austin electrical permits in the records are listed as final.
Also being built nearby
All of 78730- 3609 Atlas CvOct 9, 2026Base: installing a backup battery system and additional meter socket · 52 m away
- 3701 Humble CvFeb 18, 2026Free standing pre-engineered aluminum patio cover on pool desk 25 x 13 · 57 m away
- 10316 James Ryan WayAug 18, 2026Base: installing a backup battery system and additional meter socket · 78 m away
- 10315 James Ryan WayNov 5, 2024Install new 9.775kw rooftop solar system for residential only · 85 m away
- 10310 James Ryan WayOct 9, 2026Base: installing a backup battery system and additional meter socket · 102 m away
- 3704 Humble CvOct 2, 2008River place sec 15, amended plat of lots 99 and 103, block a · 111 m away
- 10304 James Ryan WayAug 17, 2026Base: installing a backup battery system and additional meter socket · 125 m away
- 10313 Arcana CvJul 28, 2026Replacement of an existing water heater replacement of two (2) natural gas water heaters like for like · 129 m away
- 3715 Josh LnOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 3612 Josh LnFeb 19, 2026Access and repair broken or falling drains under the home by tunneling and replacing the old drains **tunneling approx. 71ft entering from side wall repairing main drain line · 145 m away
- 3616 Josh LnJul 31, 2026Ev charger installation: install a new 60-amp circuit in the 200 msp and hardwire the emporia classic j1772 and configure to draw up to 48 amp continuous · 150 m away
- 3600 Josh LnOct 13, 2026Replacement of complete existing central heat and air system with or without duct work install new 4-ton carrier infinity series 19-seer2 variable-speed electric ac & gas heating system · 153 m away