3715 Josh Ln
Austin, TX 78730
HVAC system replacement permitted at 3715 Josh Ln
A City of Austin permit indicates replacement of the existing central heating and air system at 3715 Josh Ln, with or without duct work. The active mechanical permit was filed on October 20, 2026; an earlier permit for a central HVAC replacement was filed July 11, 2024, and is final.
Summarized from City of Austin records · updated Oct 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 20, 2026
- since Jul 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 12, 2026
- IssuedOct 20, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-133726 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system
Replacement of complete existing central heat and air system
City of Austin permitMechanical PermitFinal- Record
- 2024-083004 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3715 Josh Ln
What is happening at 3715 Josh Ln in Austin?
A City of Austin mechanical permit indicates that the existing central heat and air system is being replaced, with or without duct work. Permit 2026-133726 MP was filed October 20, 2026.
Is a new home being built at 3715 Josh Ln?
The records provided show a permit to replace the existing central heating and air system, not a permit for new home construction.
When was the HVAC replacement permitted at 3715 Josh Ln?
The active permit, 2026-133726 MP, was filed October 20, 2026.
Was there an earlier HVAC permit at 3715 Josh Ln?
Yes. Permit 2024-083004 MP, filed July 11, 2024, covered replacement of the complete existing central heat and air system. Its status is final.
Does the 2026 permit include duct work?
The permit description says the central system replacement may be with or without duct work; it does not specify which.
Also being built nearby
All of 78730- 3704 Humble CvOct 2, 2008River place sec 15, amended plat of lots 99 and 103, block a · 34 m away
- 3725 Josh LnNov 4, 2024Express: window replacement (39 windows like for like) · 71 m away
- 3716 Josh LnDec 7, 2023Replacement of an existing water heater only 1 replaced per stans rt side unit · 78 m away
- 3712 Josh LnNov 4, 2024Replacement of an existing water heater · 79 m away
- 3724 Josh LnJul 22, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 3701 Humble CvFeb 18, 2026Free standing pre-engineered aluminum patio cover on pool desk 25 x 13 · 101 m away
- 3624 Josh LnSep 17, 2025Replacement of an existing water heater we are replacing an existing tankless water heater with a new tankless water heater · 127 m away
- 3608 Atlas CvSep 15, 2026Install a 60-amp dedicated circuit for a hardwired ev charger · 141 m away
- 3616 Josh LnJul 31, 2026Ev charger installation: install a new 60-amp circuit in the 200 msp and hardwire the emporia classic j1772 and configure to draw up to 48 amp continuous · 159 m away
- 3612 Josh LnFeb 19, 2026Access and repair broken or falling drains under the home by tunneling and replacing the old drains **tunneling approx. 71ft entering from side wall repairing main drain line · 179 m away
- 3609 Atlas CvOct 9, 2026Base: installing a backup battery system and additional meter socket · 193 m away
- 10316 James Ryan WayAug 18, 2026Base: installing a backup battery system and additional meter socket · 196 m away