2605 W 49th St
Austin, TX 78731
Gas line rerouting permitted at 2605 W 49th St
A City of Austin plumbing permit filed May 4, 2026, covers moving a 1/2-inch gas line out of the return air and rerouting it to a closet, followed by an air test. The permit is marked Final.
Summarized from City of Austin records · updated May 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 4, 2026
- since May 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledFrom what we are told this is a pull3d gas meter. the hvac gas is run-through the return air. we plan to move the 1/2 gas out of the return air reroute to the closet. air test
- AppliedMay 1, 2026
- IssuedMay 4, 2026
- WorkMay '26 – May '26
- Final inspectionMay 6, 2026
Passed final inspection May 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectFrom what we are told this is a pull3d gas meter. the hvac gas is run-through the return air. we plan to move the 1/2 gas out of the return air reroute to the closet. air test
From what we are told this is a pull3d gas meter. the hvac gas is run-through the return air. we plan to move the 1/2 gas out of the return air reroute to the closet. air test
City of Austin permitPlumbing PermitFinal- Record
- 2026-054506 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2605 W 49th St
What is happening at 2605 W 49th St in Austin?
A City of Austin plumbing permit covers rerouting a 1/2-inch gas line from the return air to a closet and conducting an air test. It was filed May 4, 2026.
What does permit 2026-054506 PP cover?
The permit description says the 1/2-inch gas line will be moved out of the return air and rerouted to a closet, with an air test. It is a plumbing permit.
When was the permit filed for 2605 W 49th St?
The City of Austin permit was filed May 4, 2026.
Is the gas line work at 2605 W 49th St complete?
The permit record is marked Final. It does not provide a separate construction completion date.
Is a new building being constructed at 2605 W 49th St?
The record provided is for a plumbing permit covering gas line rerouting and an air test; it does not describe a new building.
Also being built nearby
All of 78731- 2607 W 49th StOct 6, 2026Express- replace 2 windows like for like. no structural change · 20 m away
- 2601 W 49th StSep 3, 2025Trenching 30 feet of yard for sewer yard line replacement · 45 m away
- 2604 W 49th StOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 2606 W 49th StSep 11, 202550 foot tunnel to replace cast iron-sewer lines with pvc under foundation · 67 m away
- 2606 Pembrook TrlSep 1, 2026Construct new approach of 19.2 ft and 7ft of curb/gutter. no sidewalk inspection per plan review · 68 m away
- 2613 W 49th StNov 6, 2026Relocation of 1075 sq ft 1 story sfr circa 1949 (outside city) · 80 m away
- 4702 Strass DrOct 28, 2026Base: installing a backup battery system and additional meter socket · 81 m away
- 4700 Strass DrMar 25, 2025Express: remove and replace whole home siding · 81 m away
- 4906 Strass DrFeb 6, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 2616 Pembrook TrlApr 1, 2024Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition · 102 m away
- 4905 Strass DrJan 10, 2025Express: fire damage repair · 113 m away
- 2615 Pembrook TrlOct 27, 2017Shoalwood addition sec 4 · 114 m away