groundranger
Historic · latest filing Apr 2024Residential

2616 Pembrook Trl

Austin, TX 78731

2616 Pembrook Trl: 4 projects on record

City of Austin lists 4 filings across 4 projects at 2616 Pembrook Trl, Austin, TX 78731. The most recent, filed April 1, 2024, covers: “Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition”.

Compiled from City of Austin records · updated Apr 1, 2024

Projects
4
4 filings
Latest filing
Apr 1, 2024
since Apr 1, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

  1. AppliedDec 14, 2023
  2. IssuedApr 1, 2024
  3. WorkApr '24 – Feb '27
  4. Final inspection
93% through of the permit windowApr 1, 2024 → Feb 1, 2027

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Porch enclosure to convert to a bathroom revision 1 for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    Porch enclosure to convert to a bathroom revision 1 for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    City of Austin permitBuilding PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    Porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2616 Pembrook Trl

What is being built at 2616 Pembrook Trl?

The latest filing (City of Austin permit 2024-004404 MP, April 1, 2024) covers porch enclosure to convert to a bathroom revision 1: for porch remodel into bathroom: shower size changed to 42 pan. bathroom made ada compliant. details of location of property sewer line are provided. bath instant hot water heater changed from electric to gas - necessitating the plumbing of 65 ft of gas line from east side of the house to the bath addition.

How many permits and filings does 2616 Pembrook Trl have?

4 filings across 4 projects, from April 1, 2024 to April 1, 2024.

Is there other construction near 2616 Pembrook Trl?

Yes. Nearby filings include 2618 Pembrook Trl (80 tunnel below the foundation to replace entire drain system. 3 access holes - front left right, Mar 20, 2026); 2615 Pembrook Trl (shoalwood addition sec 4, Oct 27, 2017); 2619 Pembrook Trl (replacing meter can and 200 amp panel on residence after a tree ripped the riser off of the side of the home, May 29, 2024).

How do I get alerts for new permits at 2616 Pembrook Trl?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731
Email me when it passes final inspection