groundranger
Historic · latest filing Aug 2024Residential

3409 Foothill Ter

Austin, TX 78731

3409 Foothill Ter: 1 project on record

City of Austin lists 1 filing across 1 project at 3409 Foothill Ter, Austin, TX 78731. The most recent, filed August 20, 2024, covers: “Replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill”.

Compiled from City of Austin records · updated Aug 20, 2024

Projects
1
1 filings
Latest filing
Aug 20, 2024
since Aug 20, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill

  1. AppliedAug 15, 2024
  2. IssuedAug 20, 2024
  3. WorkAug '24 – Aug '24
  4. Final inspectionAug 26, 2024

Passed final inspection Aug 26, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill

    Replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3409 Foothill Ter

What is being built at 3409 Foothill Ter?

The latest filing (City of Austin permit 2024-103423 PP, August 20, 2024) covers replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill.

How many permits and filings does 3409 Foothill Ter have?

1 filing across 1 project, from August 20, 2024 to August 20, 2024.

Is there other construction near 3409 Foothill Ter?

Yes. Nearby filings include 3407 Foothill Ter (eplan: residential expedited review - two unit- building 2 new construction of carport with apartment above [1bed 1.5bath]. existing single-family residence to remain as is, Jul 6, 2026); 3416 Foothill Ter (eplan: residential expedited review - new construction of a 1-story accessory to primary [1bath], Oct 30, 2026); 3601 Edgemont Dr (replace dca backflow device only not an irrigation installation, Oct 23, 2026).

How do I get alerts for new permits at 3409 Foothill Ter?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731
Email me when a new permit is filed