3403 Foothill Pkwy
Austin, TX 78731
3403 Foothill Pkwy: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3403 Foothill Pkwy, Austin, TX 78731. The most recent, filed February 6, 2024, covers: “Express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head”.
Compiled from City of Austin records · updated Feb 6, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 6, 2024
- since Feb 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredExpress replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head
- AppliedFeb 2, 2024
- IssuedFeb 6, 2024
- !WorkFeb '24 – Sep '24
- Final inspection
Marked expired Sep 24, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head
Express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head
City of Austin permitBuilding PermitExpired- Record
- 2024-013567 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head
Express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head
City of Austin permitPlumbing PermitExpired- Record
- 2024-013567 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3403 Foothill Pkwy
What is being built at 3403 Foothill Pkwy?
The latest filing (City of Austin permit 2024-013567 BP, February 6, 2024) covers express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head.
How many permits and filings does 3403 Foothill Pkwy have?
2 filings across 2 projects, from February 6, 2024 to February 6, 2024.
Is there other construction near 3403 Foothill Pkwy?
Yes. Nearby filings include 3400 Foothill Pkwy (cap off for water & wastewater total demolition of sfr 1973 sq ft circa 1957, Jul 14, 2026); 3402 Foothill Ter (colorado foothills section 3 & lot 12, block a lots 4&,block 5 amended plat of:, Aug 17, 2011); 3409 Foothill Ter (replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill, Aug 20, 2024).
How do I get alerts for new permits at 3403 Foothill Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 3400 Foothill PkwyJul 14, 2026Cap off for water & wastewater total demolition of sfr 1973 sq ft circa 1957 · 78 m away
- 3402 Foothill TerAug 17, 2011Colorado foothills section 3 & lot 12, block a lots 4&,block 5 amended plat of: · 106 m away
- 3409 Foothill TerAug 20, 2024Replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill · 114 m away
- 3504 Balcones DrFeb 24, 2026Sewer line replacement. replacing approximately 100 of sewer line. most of the new line will be pvc. there will be a 10 section of cast iron · 117 m away
- 3407 Foothill TerJul 6, 2026Eplan: residential expedited review - two unit- building 2 new construction of carport with apartment above [1bed 1.5bath]. existing single-family residence to remain as is · 118 m away
- 3500 W 35th StApr 27, 2026Simple re-roof · 138 m away
- 3406-1/2 Foothill TerSep 9, 20213406 foothill ter · 144 m away
- 3601 Edgemont DrOct 23, 2026Replace dca backflow device only not an irrigation installation · 146 m away
- 3416 Foothill TerOct 30, 2026Eplan: residential expedited review - new construction of a 1-story accessory to primary [1bath] · 155 m away
- 3200 W 35th StOct 23, 2026Base: installing a backup battery system and additional meter socket · 157 m away
- 3404 Foothill TerJul 16, 2012Lea trust · 159 m away
- 3412 Timberwood CirMay 14, 2026We will be trenching and replacing a 25ft section of the sewer line · 202 m away