Generator replacement and site work at 3500 W 35th St
City of Austin permits at 3500 W 35th St cover an electric generator replacement, a re-roof and an irrigation-system expansion for buffer-area landscaping at the Davis Water Treatment Plant. The generator replacement permits were filed Nov. 24, 2025, and Mar. 2, 2026; both are marked final. The re-roof permit, filed Apr. 27, 2026, is also final, while the irrigation permit filed Mar. 30, 2026, is marked expired.
Summarized from City of Austin records · updated Apr 27, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Apr 27, 2026
- since Jan 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSimple re-roof
- AppliedApr 24, 2026
- IssuedApr 27, 2026
- WorkApr '26 – May '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
6 projectsSimple re-roof
Simple re-roof
City of Austin permitBuilding PermitFinal- Record
- 2026-051067 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Maven landscapes is expanding an existing irrigation system for the buffer area of a city of austin facility/property (davis water treatment plant). the expanded irrigation system is being connected to raw water supply from lake austin using components as required by tceq for reclaimed water irrigation an existing backflow and controller. this expanded system will irrigate new trees and shrubs to be installed. we are installing additional mainline and lateral lines additional valves additional tree bubblers additional drip tubing and run additional wire. maven landscapes will provide a backflow test through a certified backflow tester
Maven landscapes is expanding an existing irrigation system for the buffer area of a city of austin facility/property (davis water treatment plant). the expanded irrigation system is being connected to raw water supply from lake austin using components as required by tceq for reclaimed water irrigation an existing backflow and controller. this expanded system will irrigate new trees and shrubs to be installed. we are installing additional mainline and lateral lines additional valves additional tree bubblers additional drip tubing and run additional wire. maven landscapes will provide a backflow test through a certified backflow tester
City of Austin permitPlumbing PermitExpired- Record
- 2026-030535 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electric generator replacement
Electric generator replacement
City of Austin permitElectrical PermitFinal- Record
- 2025-143809 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electric generator replacement
Electric generator replacement
City of Austin permitBuilding PermitFinal- Record
- 2025-143809 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Demolition of a 6000 square feet service pump station at the davis water treatment plant spc-2012-0414c ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Demolition of a 6000 square feet service pump station at the davis water treatment plant spc-2012-0414c ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitExpired- Record
- 2024-006537 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pump station facility
New pump station facility
City of Austin permitBuilding PermitFinal- Record
- 2016-052898 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3500 W 35th St
What is being built at 3500 W 35th St in Austin?
City permits describe an electric generator replacement, a re-roof and an irrigation-system expansion for buffer-area landscaping at the Davis Water Treatment Plant. The records do not describe a new building.
Is a new building planned at 3500 W 35th St?
The permits listed for this address concern a generator replacement, re-roofing and irrigation work. They do not describe new building construction.
When was the generator replacement permitted?
The City of Austin filed a building permit for the electric generator replacement on Nov. 24, 2025, and an electrical permit on Mar. 2, 2026. Both records are marked final.
What does the irrigation permit cover at the Davis Water Treatment Plant?
The Mar. 30, 2026, permit describes expanding irrigation in a buffer area, including lines, valves and tree bubblers to water new trees and shrubs. The permit is marked expired.
Was the re-roof permit at 3500 W 35th St approved?
The City of Austin's re-roof permit, filed Apr. 27, 2026, is marked final.
Also being built nearby
All of 78731- 3403 Foothill PkwyFeb 6, 2024Express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head · 138 m away
- 3400 Foothill PkwyJul 14, 2026Cap off for water & wastewater total demolition of sfr 1973 sq ft circa 1957 · 212 m away
- 3409 Foothill TerAug 20, 2024Replace up to 20.0 of main sewer line to remove bellies in the line includes excavation up to 20 in length x 7 in depth x 4 in width shoring (osha approved/required) tie in to city tap sand bedding back water valve permit services including tree permit. back fill · 214 m away
- 3200 W 35th StOct 23, 2026Base: installing a backup battery system and additional meter socket · 228 m away
- 3410 Timberwood CirJun 23, 2025Replace the cast iron drain line by way of a tunnel in the bathroom kitchen and laundry room · 229 m away
- 3414 Foothill PkwyJan 24, 2024Replacement of an existing water heater · 229 m away
- 3407 Foothill TerJul 6, 2026Eplan: residential expedited review - two unit- building 2 new construction of carport with apartment above [1bed 1.5bath]. existing single-family residence to remain as is · 230 m away
- 3412 Timberwood CirMay 14, 2026We will be trenching and replacing a 25ft section of the sewer line · 231 m away
- 3504 Balcones DrFeb 24, 2026Sewer line replacement. replacing approximately 100 of sewer line. most of the new line will be pvc. there will be a 10 section of cast iron · 234 m away
- 3402 Foothill TerAug 17, 2011Colorado foothills section 3 & lot 12, block a lots 4&,block 5 amended plat of: · 244 m away
- 3416 Foothill TerOct 30, 2026Eplan: residential expedited review - new construction of a 1-story accessory to primary [1bath] · 250 m away
- 3417 Foothill TerOct 5, 2026Partial demolition - addition/ remodel of sfr. two story addition to sfr. convert two existing bathrooms into a single bathroom & convert existing bedrooms into den. stone patio and steel trellis to be removed to recover impervious coverage · 261 m away