3509 Hillbrook Cir
Austin, TX 78731
Electrical service replacement permitted on Hillbrook Cir
An Austin electrical permit covers disconnecting and replacing the 200-amp overhead electrical service at 3509 Hillbrook Cir. The permit was filed on February 14, 2026, and is listed as active.
Summarized from City of Austin records · updated Feb 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 14, 2026
- since Feb 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayRequest to disconnect replace 200a overhead service
- AppliedFeb 12, 2026
- IssuedFeb 14, 2026
- WorkFeb '26 – Nov '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectRequest to disconnect replace 200a overhead service
Request to disconnect replace 200a overhead service
City of Austin permitElectrical PermitActive- Record
- 2026-016870 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3509 Hillbrook Cir
What work is planned at 3509 Hillbrook Cir?
An Austin electrical permit describes disconnecting and replacing the 200-amp overhead electrical service.
When was the permit filed for 3509 Hillbrook Cir?
The permit was filed on February 14, 2026.
What is the permit number for 3509 Hillbrook Cir?
The permit number is 2026-016870 EP.
Is a new home being built at 3509 Hillbrook Cir?
The available record is for electrical service work. It does not describe construction of a new home.
Is the 3509 Hillbrook Cir electrical permit active?
Yes. The City of Austin record lists permit 2026-016870 EP as active.
Also being built nearby
All of 78731- 3513 Hillbrook DrApr 2, 2024Create tunnel access to foundation through concrete garage dig tunnel approx. 23 feet to access pipes chip through grade beam in foundation for pipe access install pressed piles under 2 grade beams demolition existing cast iron and replacement with pvc approximately 25 feet · 28 m away
- 3505 Hillbrook CirJul 13, 2025Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 3512 Hillbrook DrDec 11, 2025Laundry drain repair had running trap removed and installed in wall and connected to cast iron main line under house in crawl space · 63 m away
- 3520 Highland View DrJan 17, 2024Change out water heater · 65 m away
- 3514 Highland View DrSep 9, 2024Sewer line permit · 66 m away
- 3512 Highland View DrDec 16, 2025Express: replace one window like for like · 66 m away
- 3503 Hillbrook CirOct 16, 2026Replacing all cast iron above and below the slab. we will be cutting interior wall to remove all cast iron. tunneling 65 linear feet. 3 access holes. one front of home and 2 in back of home. using sch 40 pvc for all drain and sewer work. no cutting or removal of concrete. replacing the main water line. installing a tankless water heater · 68 m away
- 3519 Highland View DrSep 16, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system · 78 m away
- 3517 Hillbrook DrOct 9, 2026We plan to install: (n) 7.920 kw dc roof mount solar pv system with (n) 18 - hyundai solar: his-t440nf(bk) 440w pv modules with (n) 6 tesla: rsd mci-2 with (n) 01 tesla: powerwall 3 (1707000-21-y) · 80 m away
- 3507 Hillbrook DrDec 6, 2023Express - installing 1 door and 6 windows - like for like · 93 m away
- 3505 Hillbrook DrDec 29, 2023Trench thru yard to repair yard sewer line · 112 m away
- 5942 Highland Hills DrNov 20, 2023Replacement of complete existing central heat and air system with or without duct work · 114 m away