3505 Hillbrook Dr
Austin, TX 78731
3505 Hillbrook Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3505 Hillbrook Dr, Austin, TX 78731 since December 11, 2023. The most recent, filed December 29, 2023, covers: “Trench thru yard to repair yard sewer line”.
Compiled from City of Austin records · updated Dec 29, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 29, 2023
- since Dec 11, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTrench thru yard to repair yard sewer line
- AppliedDec 18, 2023
- IssuedDec 29, 2023
- WorkDec '23 – Feb '24
- Final inspectionFeb 16, 2024
Passed final inspection Feb 16, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTrench thru yard to repair yard sewer line
Trench thru yard to repair yard sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2023-160778 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
10 yardline
10 yardline
City of Austin permitPlumbing PermitWithdrawn- Record
- 2023-156547 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3505 Hillbrook Dr
What is being built at 3505 Hillbrook Dr?
The latest filing (City of Austin permit 2023-160778 PP, December 29, 2023) covers trench thru yard to repair yard sewer line.
How many permits and filings does 3505 Hillbrook Dr have?
2 filings across 2 projects, from December 11, 2023 to December 29, 2023.
Is there other construction near 3505 Hillbrook Dr?
Yes. Nearby filings include 3507 Hillbrook Dr (express - installing 1 door and 6 windows - like for like, Dec 6, 2023); 3502 Hillbrook Dr (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc, Feb 24, 2026); 3503 Hillbrook Cir (replacing all cast iron above and below the slab. we will be cutting interior wall to remove all cast iron. tunneling 65 linear feet. 3 access holes. one front of home and 2 in back of home. using sch 40 pvc for all drain and sewer work. no cutting or removal of concrete. replacing the main water line. installing a tankless water heater, Oct 16, 2026).
How do I get alerts for new permits at 3505 Hillbrook Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 3507 Hillbrook DrDec 6, 2023Express - installing 1 door and 6 windows - like for like · 28 m away
- 3502 Hillbrook DrFeb 24, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 64 m away
- 3503 Hillbrook CirOct 16, 2026Replacing all cast iron above and below the slab. we will be cutting interior wall to remove all cast iron. tunneling 65 linear feet. 3 access holes. one front of home and 2 in back of home. using sch 40 pvc for all drain and sewer work. no cutting or removal of concrete. replacing the main water line. installing a tankless water heater · 87 m away
- 5961 Highland Hills DrJun 5, 2025Repair riser conduit vcaused by storm damage · 91 m away
- 3505 Hillbrook CirJul 13, 2025Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 6001 Highland Hills DrMay 21, 2024New attached uncovered deck with railing · 94 m away
- 6004 Highland Hills DrAug 19, 2026Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 3509 Hillbrook CirFeb 14, 2026Request to disconnect replace 200a overhead service · 112 m away
- 6100 Shadow Mountain DrNov 3, 2025Remodel of existing bathroom will require relocation of walls structural plan provided · 114 m away
- 3512 Hillbrook DrDec 11, 2025Laundry drain repair had running trap removed and installed in wall and connected to cast iron main line under house in crawl space · 122 m away
- 6005 Highland Hills DrJul 9, 202480 ft repair to sewer line. will tunnel 40 ft. repair drain lines. tunneling will start on right side of house - ending left side. repair yard lines from house connection to city tap · 124 m away
- 3506 Laurel Ledge LnJan 21, 2025Upgrade service on the outside to 200amp ug · 127 m away