6001 Highland Hills Dr
Austin, TX 78731
6001 Highland Hills Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6001 Highland Hills Dr, Austin, TX 78731. The most recent, filed May 21, 2024, covers: “New attached uncovered deck with railing”.
Compiled from City of Austin records · updated May 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2024
- since May 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNew attached uncovered deck with railing
- AppliedMar 19, 2024
- IssuedMay 21, 2024
- !WorkMay '24 – Aug '25
- Final inspection
Marked expired Aug 31, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew attached uncovered deck with railing
New attached uncovered deck with railing
City of Austin permitBuilding PermitExpired- Record
- 2024-055327 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6001 Highland Hills Dr
What is being built at 6001 Highland Hills Dr?
The latest filing (City of Austin permit 2024-055327 BP, May 21, 2024) covers new attached uncovered deck with railing.
How many permits and filings does 6001 Highland Hills Dr have?
1 filing across 1 project, from May 21, 2024 to May 21, 2024.
Is there other construction near 6001 Highland Hills Dr?
Yes. Nearby filings include 5961 Highland Hills Dr (repair riser conduit vcaused by storm damage, Jun 5, 2025); 6005 Highland Hills Dr (80 ft repair to sewer line. will tunnel 40 ft. repair drain lines. tunneling will start on right side of house - ending left side. repair yard lines from house connection to city tap, Jul 9, 2024); 6103 Shadow Valley Dr (replacement of an existing water heater, Apr 5, 2024).
How do I get alerts for new permits at 6001 Highland Hills Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 5961 Highland Hills DrJun 5, 2025Repair riser conduit vcaused by storm damage · 25 m away
- 6005 Highland Hills DrJul 9, 202480 ft repair to sewer line. will tunnel 40 ft. repair drain lines. tunneling will start on right side of house - ending left side. repair yard lines from house connection to city tap · 51 m away
- 6103 Shadow Valley DrApr 5, 2024Replacement of an existing water heater · 59 m away
- 6004 Shadow Valley CvApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 6004 Highland Hills DrAug 19, 2026Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 3502 Hillbrook DrFeb 24, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 79 m away
- 6105 Shadow Valley DrAug 26, 2024Express: siding repair · 84 m away
- 3505 Hillbrook DrDec 29, 2023Trench thru yard to repair yard sewer line · 94 m away
- 6100 Shadow Mountain DrNov 3, 2025Remodel of existing bathroom will require relocation of walls structural plan provided · 112 m away
- 3507 Hillbrook DrDec 6, 2023Express - installing 1 door and 6 windows - like for like · 121 m away
- 6101 Shadow Mountain DrJun 2, 2026Tunneling under home to replace cast iron sanitary piping for kitchen and bathrooms as well as replace or repairing copper water lines as needed. **we will be tunneling approximately 810 feet beneath the home with access located in the living room adjacent to the first-floor bathroom. the existing cast iron sanitary system will be replaced with approximately 200 feet of pvc piping. in addition the existing copper water distribution system will be abandoned and replaced with pex piping · 125 m away
- 6102 Shadow Mountain DrMar 20, 2026Replacement of complete existing central heat and air system with or without duct work gonzales · 139 m away