3804 Hillbrook Dr
Austin, TX 78731
3804 Hillbrook Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3804 Hillbrook Dr, Austin, TX 78731. The most recent, filed August 27, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work residential hvac change out. lennox 4.0 ton elite (up-flow) gas 80%”.
Compiled from City of Austin records · updated Aug 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 27, 2025
- since Aug 27, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work residential hvac change out. lennox 4.0 ton elite (up-flow) gas 80%
- AppliedAug 20, 2025
- IssuedAug 27, 2025
- !WorkAug '25 – Feb '26
- Final inspection
Marked expired Feb 24, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work residential hvac change out. lennox 4.0 ton elite (up-flow) gas 80%
Replacement of complete existing central heat and air system with or without duct work residential hvac change out. lennox 4.0 ton elite (up-flow) gas 80%
City of Austin permitMechanical PermitExpired- Record
- 2025-105874 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3804 Hillbrook Dr
What is being built at 3804 Hillbrook Dr?
The latest filing (City of Austin permit 2025-105874 MP, August 27, 2025) covers replacement of complete existing central heat and air system with or without duct work residential hvac change out. lennox 4.0 ton elite (up-flow) gas 80%.
How many permits and filings does 3804 Hillbrook Dr have?
1 filing across 1 project, from August 27, 2025 to August 27, 2025.
Is there other construction near 3804 Hillbrook Dr?
Yes. Nearby filings include 3802 Hillbrook Dr (interior remodel raise a drop ceiling and replace cabinetry in our 9.5 foot by 16.5 foot kitchen. non-structural framing work will include removing the soffits to raise the ceiling from 7 feet to 8 feet to match a current 4x8 foot light well and to narrow a current 45 inch opening down to increase available wall space. an attached expanded scope of work specifies the plumbing electrical and duct work, Jun 2, 2026); 3806 Hillbrook Dr (irrigation install on grass areas only ( back yard), Aug 27, 2024); 6003 Spancreek Cir (interior remodel of sfr, Apr 9, 2025).
How do I get alerts for new permits at 3804 Hillbrook Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 3802 Hillbrook DrJun 2, 2026Interior remodel raise a drop ceiling and replace cabinetry in our 9.5 foot by 16.5 foot kitchen. non-structural framing work will include removing the soffits to raise the ceiling from 7 feet to 8 feet to match a current 4x8 foot light well and to narrow a current 45 inch opening down to increase available wall space. an attached expanded scope of work specifies the plumbing electrical and duct work · 29 m away
- 3806 Hillbrook DrAug 27, 2024Irrigation install on grass areas only ( back yard) · 35 m away
- 6003 Spancreek CirApr 9, 2025Interior remodel of sfr · 46 m away
- 3807 Hillbrook DrApr 11, 2025Excavation of both existing sewer lines in the back yard from the house to the city tap 100 feet and replacement with new pvc pipe and fittings to code per city specifications · 49 m away
- 6004 Highlandale DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 3808 Hillbrook DrMar 26, 2024Tunnel below the foundation to repair drain lines · 65 m away
- 6000 Spancreek CirMay 2, 2024Tunnel under foundation about 80 to 90 feet to replace cast iron for 3 bathrooms kitchen and washer drain line access hole will be located in the front and second will be inside with a 3 foot by 3 foot access hole. replace sewerline from home to city tap sewer line length is about 60 to 70 ft · 85 m away
- 6005 Spancreek CirMar 27, 2024Express: interior non-structural exploratory demolition work structural observation or evaluation only remove drywall in bathrooms/kitchen area to inspect leak revision 1: repair and replace sewer lines & plumbing fixtures revision 2: repair and replace siding replace aluminum wiring with copper repair and replace hvac · 90 m away
- 5908 Paseo Del ToroJul 22, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <45 feet new 3/4 emt conduit and <5 feet new 3/4 flex conduit to power the level 2 ev charger at 48amp constant draw · 90 m away
- 3813 Hillbrook DrNov 2, 2026Excavate 33 tunnel to repair main drain line under house · 91 m away
- 5912 Paseo Del ToroMay 30, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two-stage gas system · 95 m away
- 6002 Spancreek CirOct 15, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. two access holes will be required: one in front and one on the side · 109 m away