groundranger
Recent · latest filing May 2025Residential

5912 Paseo Del Toro

Austin, TX 78731

5912 Paseo Del Toro: 2 projects on record

City of Austin lists 2 filings across 2 projects at 5912 Paseo Del Toro, Austin, TX 78731 since August 20, 2024. The most recent, filed May 30, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two-stage gas system”.

Compiled from City of Austin records · updated May 30, 2025

Projects
2
2 filings
Latest filing
May 30, 2025
since Aug 20, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two-stage gas system

  1. AppliedMay 9, 2025
  2. IssuedMay 30, 2025
  3. WorkMay '25 – Jun '25
  4. Final inspectionJun 18, 2025

Passed final inspection Jun 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two-stage gas system

    Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two-stage gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Complete yard line replacement

    Complete yard line replacement

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5912 Paseo Del Toro

What is being built at 5912 Paseo Del Toro?

The latest filing (City of Austin permit 2025-057793 MP, May 30, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two-stage gas system.

How many permits and filings does 5912 Paseo Del Toro have?

2 filings across 2 projects, from August 20, 2024 to May 30, 2025.

Is there other construction near 5912 Paseo Del Toro?

Yes. Nearby filings include 5908 Paseo Del Toro (level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <45 feet new 3/4 emt conduit and <5 feet new 3/4 flex conduit to power the level 2 ev charger at 48amp constant draw, Jul 22, 2026); 5911 Camino Seco (replacement of complete existing central heat and air system with or without duct work, Apr 22, 2024); 3807 Hillbrook Dr (excavation of both existing sewer lines in the back yard from the house to the city tap 100 feet and replacement with new pvc pipe and fittings to code per city specifications, Apr 11, 2025).

How do I get alerts for new permits at 5912 Paseo Del Toro?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731
Email me when a new permit is filed