3988 Far West Blvd
Austin, TX 78731
3988 Far West Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 3988 Far West Blvd, Austin, TX 78731. The most recent, filed April 27, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Apr 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 27, 2025
- since Apr 27, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedApr 23, 2025
- IssuedApr 27, 2025
- WorkApr '25 – Oct '25
- Final inspectionApr 28, 2025
Passed final inspection Apr 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-050095 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3988 Far West Blvd
What is being built at 3988 Far West Blvd?
The latest filing (City of Austin permit 2025-050095 EP, April 27, 2025) covers install evse.
How many permits and filings does 3988 Far West Blvd have?
1 filing across 1 project, from April 27, 2025 to April 27, 2025.
Is there other construction near 3988 Far West Blvd?
Yes. Nearby filings include 3986 Far West Blvd (replacement of complete existing central heat and air system with or without duct work, Feb 13, 2024); 7101 Montana Norte (replacement of an existing water heater replacement of 2 40 gallon natural gas water heaters, Oct 14, 2026); 7103 Montana Norte (request to disconnect and reconnect. trutec will be upgrading exalting services to 200 amp service grounding system meter base and proper surge protection. raising riser up to raise device wire off of roof and provide proper clearance, Jul 13, 2026).
How do I get alerts for new permits at 3988 Far West Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 3986 Far West BlvdFeb 13, 2024Replacement of complete existing central heat and air system with or without duct work · 5 m away
- 7101 Montana NorteOct 14, 2026Replacement of an existing water heater replacement of 2 40 gallon natural gas water heaters · 31 m away
- 7103 Montana NorteJul 13, 2026Request to disconnect and reconnect. trutec will be upgrading exalting services to 200 amp service grounding system meter base and proper surge protection. raising riser up to raise device wire off of roof and provide proper clearance · 36 m away
- 3978 Far West BlvdNov 16, 2026Replace water heater with new 50 gallon water heater and bring up to code that is at the moment located in the attic and run out t and p line to the outside with a new drain pan and condensate line · 38 m away
- 7105 Montana NorteJun 10, 2024Replacement of complete existing central heat and air system with or without duct work · 60 m away
- 3970 Far West BlvdJul 22, 2024(mccaskill greg) - installation of circuit for elec. vehicle charging station - esip · 66 m away
- 3931 Far West BlvdJun 13, 2025***storm related-hyatt*** emergency service repair inspection has already been passed on june 9 2025 · 74 m away
- 7102 Montana NorteMar 4, 2026Construct new driveway approach of 16 ft · 76 m away
- 7100 Montana NorteOct 20, 2026Replacement of complete existing central heat and air system with or without duct work like for like 4 ton 2-stage vertical gas · 81 m away
- 7107 Montana NorteSep 15, 2026Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 4001 Far West BlvdOct 8, 2025Install new gas line for generator · 93 m away
- 7007 Edgefield DrJan 9, 202415ft of sewer line repair under home per pc just repair no remodel will be done · 104 m away