7007 Edgefield Dr
Austin, TX 78731
7007 Edgefield Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7007 Edgefield Dr, Austin, TX 78731. The most recent, filed January 9, 2024, covers: “15ft of sewer line repair under home per pc just repair no remodel will be done”.
Compiled from City of Austin records · updated Jan 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2024
- since Jan 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled15ft of sewer line repair under home per pc just repair no remodel will be done
- AppliedJan 8, 2024
- IssuedJan 9, 2024
- WorkJan '24 – Feb '24
- Final inspectionFeb 22, 2024
Passed final inspection Feb 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project15ft of sewer line repair under home per pc just repair no remodel will be done
15ft of sewer line repair under home per pc just repair no remodel will be done
City of Austin permitPlumbing PermitFinal- Record
- 2024-002086 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7007 Edgefield Dr
What is being built at 7007 Edgefield Dr?
The latest filing (City of Austin permit 2024-002086 PP, January 9, 2024) covers 15ft of sewer line repair under home per pc just repair no remodel will be done.
How many permits and filings does 7007 Edgefield Dr have?
1 filing across 1 project, from January 9, 2024 to January 9, 2024.
Is there other construction near 7007 Edgefield Dr?
Yes. Nearby filings include 7005 Edgefield Dr (test on gas line for inspection, Jun 18, 2024); 7003 Edgefield Dr (whole house tunnel repair/repipe and main sewer line replacement, Jul 16, 2024); 7002 Edgefield Dr (replacement of complete existing central heat and air system with or without duct work, Jan 21, 2025).
How do I get alerts for new permits at 7007 Edgefield Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7005 Edgefield DrJun 18, 2024Test on gas line for inspection · 27 m away
- 7003 Edgefield DrJul 16, 2024Whole house tunnel repair/repipe and main sewer line replacement · 56 m away
- 7002 Edgefield DrJan 21, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 7004 Northledge DrApr 5, 2024Replacement of an existing water heater · 75 m away
- 3931 Far West BlvdJun 13, 2025***storm related-hyatt*** emergency service repair inspection has already been passed on june 9 2025 · 82 m away
- 7009 Northledge DrJul 31, 20207009 northledge drive · 95 m away
- 4000 North Hills DrJul 10, 202550 tunnel below the foundation to replace the main line back bathroom and utility drain lines. access holes - right left and front · 99 m away
- 4001 Far West BlvdOct 8, 2025Install new gas line for generator · 100 m away
- 3978 Far West BlvdNov 16, 2026Replace water heater with new 50 gallon water heater and bring up to code that is at the moment located in the attic and run out t and p line to the outside with a new drain pan and condensate line · 103 m away
- 3986 Far West BlvdFeb 13, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 3988 Far West BlvdApr 27, 2025Install evse · 104 m away
- 3970 Far West BlvdJul 22, 2024(mccaskill greg) - installation of circuit for elec. vehicle charging station - esip · 112 m away