7003 Edgefield Dr
Austin, TX 78731
7003 Edgefield Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7003 Edgefield Dr, Austin, TX 78731. The most recent, filed July 16, 2024, covers: “Whole house tunnel repair/repipe and main sewer line replacement”.
Compiled from City of Austin records · updated Jul 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2024
- since Jul 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWhole house tunnel repair/repipe and main sewer line replacement
- AppliedJul 12, 2024
- IssuedJul 16, 2024
- WorkJul '24 – Aug '24
- Final inspectionAug 22, 2024
Passed final inspection Aug 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectWhole house tunnel repair/repipe and main sewer line replacement
Whole house tunnel repair/repipe and main sewer line replacement
City of Austin permitPlumbing PermitFinal- Record
- 2024-086610 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7003 Edgefield Dr
What is being built at 7003 Edgefield Dr?
The latest filing (City of Austin permit 2024-086610 PP, July 16, 2024) covers whole house tunnel repair/repipe and main sewer line replacement.
How many permits and filings does 7003 Edgefield Dr have?
1 filing across 1 project, from July 16, 2024 to July 16, 2024.
Is there other construction near 7003 Edgefield Dr?
Yes. Nearby filings include 7005 Edgefield Dr (test on gas line for inspection, Jun 18, 2024); 4000 North Hills Dr (50 tunnel below the foundation to replace the main line back bathroom and utility drain lines. access holes - right left and front, Jul 10, 2025); 7004 Northledge Dr (replacement of an existing water heater, Apr 5, 2024).
How do I get alerts for new permits at 7003 Edgefield Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7005 Edgefield DrJun 18, 2024Test on gas line for inspection · 29 m away
- 4000 North Hills DrJul 10, 202550 tunnel below the foundation to replace the main line back bathroom and utility drain lines. access holes - right left and front · 44 m away
- 7004 Northledge DrApr 5, 2024Replacement of an existing water heater · 50 m away
- 7002 Edgefield DrJan 21, 2025Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 7007 Edgefield DrJan 9, 202415ft of sewer line repair under home per pc just repair no remodel will be done · 56 m away
- 3920 North Hills DrAug 14, 2026Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 4004 North Hills DrMar 11, 202522 trench to replace yard sewer · 92 m away
- 7005 Northledge DrNov 21, 2008Doss elementary school site improvements · 100 m away
- 3919 North Hills DrJun 16, 2026Replacement of an existing water heater replacement of two (2) ng water heaters like for like · 106 m away
- 3931 Far West BlvdJun 13, 2025***storm related-hyatt*** emergency service repair inspection has already been passed on june 9 2025 · 108 m away
- 7009 Northledge DrJul 31, 20207009 northledge drive · 113 m away
- 4001 Far West BlvdOct 8, 2025Install new gas line for generator · 117 m away