City of Austin lists 2 filings across 2 projects at 4015 Greystone Dr, Austin, TX 78731. The most recent, filed February 9, 2024, covers: “Express: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head”.
Compiled from City of Austin records · updated Feb 9, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 9, 2024
- since Feb 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
- AppliedFeb 9, 2024
- IssuedFeb 9, 2024
- WorkFeb '24 – Apr '24
- Final inspectionApr 2, 2024
Passed final inspection Apr 2, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExpress: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
Express: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
City of Austin permitPlumbing PermitFinal- Record
- 2024-016456 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
Express: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
City of Austin permitBuilding PermitFinal- Record
- 2024-016456 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4015 Greystone Dr
What is being built at 4015 Greystone Dr?
The latest filing (City of Austin permit 2024-016456 PP, February 9, 2024) covers express: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head.
How many permits and filings does 4015 Greystone Dr have?
2 filings across 2 projects, from February 9, 2024 to February 9, 2024.
Is there other construction near 4015 Greystone Dr?
Yes. Nearby filings include 4013 Greystone Dr (excavate 100 tunnel to repair drain line, Dec 27, 2023); 4028 Enclave Mesa Cir (repair of failed laundry drain by tunnel, Mar 26, 2024); 4024 Enclave Mesa Cir (new irrigation installation, Sep 17, 2026).
How do I get alerts for new permits at 4015 Greystone Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4013 Greystone DrDec 27, 2023Excavate 100 tunnel to repair drain line · 33 m away
- 4028 Enclave Mesa CirMar 26, 2024Repair of failed laundry drain by tunnel · 39 m away
- 4024 Enclave Mesa CirSep 17, 2026New irrigation installation · 46 m away
- 4012 Greystone DrJan 12, 2024Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 4036 Enclave Mesa CirFeb 1, 2024Gas pipe install for home generator · 68 m away
- 4021 Greystone DrAug 26, 2025Demolition old driveway. construct new driveway approach of 20 ft · 78 m away
- 4041 Enclave Mesa CirAug 18, 2026Base: installing a backup battery system and additional meter socket · 82 m away
- 4016 Enclave Mesa CirOct 30, 2026Base: installing a backup battery system and additional meter socket · 88 m away
- 4009 Enclave Mesa CirFeb 5, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system with ductwork · 93 m away
- 4040 Enclave Mesa CirDec 28, 2023Install gas piping for generator · 96 m away
- 4010 Greystone DrMay 26, 2026Replacement of an existing water heater · 106 m away
- 4014 Edgerock DrNov 2, 2024Construct new driveway approach of 18.5 ft and curb & gutter of 28 ft. no sidewalk inspection per plan review · 124 m away