4040 Enclave Mesa Cir
Austin, TX 78731
4040 Enclave Mesa Cir: 2 projects on record
City of Austin lists 2 filings across 2 projects at 4040 Enclave Mesa Cir, Austin, TX 78731 since November 30, 2023. The most recent, filed December 28, 2023, covers: “Install gas piping for generator”.
Compiled from City of Austin records · updated Dec 28, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 28, 2023
- since Nov 30, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall gas piping for generator
- AppliedDec 22, 2023
- IssuedDec 28, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 29, 2023
Passed final inspection Dec 29, 2023.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall gas piping for generator
Install gas piping for generator
City of Austin permitPlumbing PermitFinal- Record
- 2023-162868 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect - install generator with 150-amp automatic transfer switch
Request to disconnect - install generator with 150-amp automatic transfer switch
City of Austin permitElectrical PermitFinal- Record
- 2023-153096 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4040 Enclave Mesa Cir
What is being built at 4040 Enclave Mesa Cir?
The latest filing (City of Austin permit 2023-162868 PP, December 28, 2023) covers install gas piping for generator.
How many permits and filings does 4040 Enclave Mesa Cir have?
2 filings across 2 projects, from November 30, 2023 to December 28, 2023.
Is there other construction near 4040 Enclave Mesa Cir?
Yes. Nearby filings include 4036 Enclave Mesa Cir (gas pipe install for home generator, Feb 1, 2024); 4041 Enclave Mesa Cir (base: installing a backup battery system and additional meter socket, Aug 18, 2026); 4052 Enclave Mesa Cir (replacement of an existing water heater, Dec 27, 2023).
How do I get alerts for new permits at 4040 Enclave Mesa Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4036 Enclave Mesa CirFeb 1, 2024Gas pipe install for home generator · 35 m away
- 4041 Enclave Mesa CirAug 18, 2026Base: installing a backup battery system and additional meter socket · 47 m away
- 4052 Enclave Mesa CirDec 27, 2023Replacement of an existing water heater · 64 m away
- 4028 Enclave Mesa CirMar 26, 2024Repair of failed laundry drain by tunnel · 67 m away
- 4013 Greystone DrDec 27, 2023Excavate 100 tunnel to repair drain line · 89 m away
- 4024 Enclave Mesa CirSep 17, 2026New irrigation installation · 90 m away
- 4015 Greystone DrFeb 9, 2024Express: replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head · 96 m away
- 4009 Enclave Mesa CirFeb 5, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system with ductwork · 97 m away
- 7304 Knox LnNov 7, 2026Knox preserve · 122 m away
- 4005 Greystone DrAug 25, 2026Base: installing a backup battery system and additional meter socket · 133 m away
- 4064 Enclave Mesa CirMay 26, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas · 134 m away
- 4012 Greystone DrJan 12, 2024Replacement of complete existing central heat and air system with or without duct work · 138 m away