5901 Lookout Mountain Dr
Austin, TX 78731
5901 Lookout Mountain Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5901 Lookout Mountain Dr, Austin, TX 78731. The most recent, filed August 8, 2025, covers: “Express - removing and replacing 5 windows like for like”.
Compiled from City of Austin records · updated Aug 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 8, 2025
- since Aug 8, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - removing and replacing 5 windows like for like
- AppliedJul 17, 2025
- IssuedAug 8, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 15, 2025
Passed final inspection Sep 15, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress - removing and replacing 5 windows like for like
Express - removing and replacing 5 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2025-088918 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5901 Lookout Mountain Dr
What is being built at 5901 Lookout Mountain Dr?
The latest filing (City of Austin permit 2025-088918 BP, August 8, 2025) covers express - removing and replacing 5 windows like for like.
How many permits and filings does 5901 Lookout Mountain Dr have?
1 filing across 1 project, from August 8, 2025 to August 8, 2025.
Is there other construction near 5901 Lookout Mountain Dr?
Yes. Nearby filings include 5903 Lookout Mountain Dr (replacement of complete existing central heat and air system with or without duct work, Aug 12, 2024); 5905 Lookout Mountain Dr (emergency disconnect and reconnect needed. a phase in panel #2 on the right the 150 amp panel a phase main feeder was loose and is currently melting and arching replacing all damaged components. not touching 200 amp panel, Mar 31, 2025); 5909 Lookout Mountain Dr (replacement of an existing water heater replacing water heater with similar model, Aug 5, 2026).
How do I get alerts for new permits at 5901 Lookout Mountain Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 5903 Lookout Mountain DrAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 8 m away
- 5905 Lookout Mountain DrMar 31, 2025Emergency disconnect and reconnect needed. a phase in panel #2 on the right the 150 amp panel a phase main feeder was loose and is currently melting and arching replacing all damaged components. not touching 200 amp panel · 15 m away
- 5909 Lookout Mountain DrAug 5, 2026Replacement of an existing water heater replacing water heater with similar model · 31 m away
- 5906 Lookout Mountain DrMay 15, 2024Replace 2 electric water heaters with hybrid proterra · 56 m away
- 4705 Lookout Mountain CvAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 5918 Lookout Mountain DrMay 30, 2025Addition/ remodel to existing 2-story single-family residential to include: adding 145 sq ft storage room on ground level adding 145 sq ft family room adding covered and uncovered exterior 2nd and 3rd floor decks. revision #1: removing existing single door in master bedroom and replacing existing windows with patio double door. relocating exterior stairs at deck area to house side · 118 m away
- 5902 Balsam HolwFeb 5, 2026Express: removing and replacing 20 windows 1 door (like for like) · 120 m away
- 4702 Gold Flower HolwMar 24, 2026Replacement of complete existing central heat and air system with or without duct work install 3 ton and 3.5 ton ac system · 130 m away
- 4705 Hickory HolwMay 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas green speed - downstairs like for like: 3 ton horizontal gas green speed - upstairs **two system change out · 142 m away
- 4805 Fern HolwJul 31, 2024Express: rear off existing tile supply and install radiant barrier decking on entire roof and shingles · 147 m away
- 4703 Hickory HolwMay 1, 2026200amp panel 2ooamp meter base grounding and bonding · 149 m away
- 4710 Lookout Mountain CvMay 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage horizontal gas - upstairs · 155 m away