6002 Upvalley Run
Austin, TX 78731
Home repairs and HVAC replacement at 6002 Upvalley Run
Austin permits show whole-home sheathing and siding replacement and window work at 6002 Upvalley Run, permitted January 7, 2025. A permit dated October 21, 2025, covers replacement of the home's central heating and air system; an earlier 2023 permit covered a car charger.
Summarized from City of Austin records · updated Oct 21, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Oct 21, 2025
- since Jan 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work located in hallway with pull down stairs
- AppliedOct 14, 2025
- IssuedOct 21, 2025
- WorkOct '25 – Jan '26
- Final inspectionJan 12, 2026
Passed final inspection Jan 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work located in hallway with pull down stairs
Replacement of complete existing central heat and air system with or without duct work located in hallway with pull down stairs
City of Austin permitMechanical PermitFinal- Record
- 2025-133352 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: remove and replace whole home and siding osb sheathing. replace windows at 27 openings excluding the downstairs bath
Express: remove and replace whole home and siding osb sheathing. replace windows at 27 openings excluding the downstairs bath
City of Austin permitBuilding PermitFinal- Record
- 2025-001817 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install customer provided car charger
Install customer provided car charger
City of Austin permitElectrical PermitFinal- Record
- 2023-134171 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6002 Upvalley Run
What is being built at 6002 Upvalley Run?
The permits describe home repairs and equipment replacement, not a new building. Work includes sheathing, siding and window replacement, plus replacement of the central heating and air system.
Is 6002 Upvalley Run being renovated?
Austin issued a building permit on January 7, 2025, for whole-home sheathing and siding replacement and window work at 27 openings, excluding the downstairs bathroom.
Was a new HVAC system permitted at 6002 Upvalley Run?
A mechanical permit dated October 21, 2025, covers replacement of the complete existing central heating and air system, with or without duct work. The permit number is 2025-133352 MP.
Are the windows being replaced at 6002 Upvalley Run?
The January 7, 2025, building permit describes window replacement at 27 openings, excluding the downstairs bathroom. It also covers whole-home sheathing and siding work.
Was a car charger permitted at 6002 Upvalley Run?
Yes. An electrical permit dated October 18, 2023, covers installation of a customer-provided car charger.
Also being built nearby
All of 78731- 6004 Upvalley RunMay 8, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system · 27 m away
- 6003 Upvalley RunMay 7, 2025Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 6001 Upvalley RunOct 23, 2026Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 6002 Mount Bonnell CvAug 20, 2026Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 5911 Down Valley CtAug 25, 2026Replacement of an existing water heater 40gal gas tank located in the attic · 86 m away
- 4507 Knap HolwSep 24, 2024Gas line for install stand by generator · 89 m away
- 6008 Mount Bonnell CvMar 14, 2024Replacement of electric water heater with a hybrid water heater · 96 m away
- 4502 Upvalley CtFeb 28, 2024New inground pool · 99 m away
- 4508 Knap HolwAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 5906 Down Valley CtSep 29, 2026Base: installing a backup battery system and additional meter socket · 112 m away
- 5900 Down Valley CtSep 18, 202540 tunnel below the foundation to repair sewer main servicing left side of home (master and hall bath).2 access holes - front back · 112 m away
- 5904 Down Valley CtMay 29, 2025Replacement of complete existing central heat and air system with or without duct work · 115 m away