4508 Knap Holw
Austin, TX 78731
4508 Knap Holw: 1 project on record
City of Austin lists 1 filing across 1 project at 4508 Knap Holw, Austin, TX 78731. The most recent, filed August 7, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 7, 2024
- since Aug 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 5, 2024
- IssuedAug 7, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 13, 2024
Passed final inspection Aug 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-098314 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4508 Knap Holw
What is being built at 4508 Knap Holw?
The latest filing (City of Austin permit 2024-098314 MP, August 7, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 4508 Knap Holw have?
1 filing across 1 project, from August 7, 2024 to August 7, 2024.
Is there other construction near 4508 Knap Holw?
Yes. Nearby filings include 4507 Knap Holw (gas line for install stand by generator, Sep 24, 2024); 6029 Mount Bonnell Cv (install evse at garage, Dec 8, 2023); 4504 Knap Holw (install new 10.9kw rooftop solar system and 13.5kw energy storage system for existing residential only, Jan 17, 2024).
How do I get alerts for new permits at 4508 Knap Holw?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4507 Knap HolwSep 24, 2024Gas line for install stand by generator · 22 m away
- 6029 Mount Bonnell CvDec 8, 2023Install evse at garage · 35 m away
- 4504 Knap HolwJan 17, 2024Install new 10.9kw rooftop solar system and 13.5kw energy storage system for existing residential only · 43 m away
- 6002 Mount Bonnell CvAug 20, 2026Replacement of complete existing central heat and air system with or without duct work · 45 m away
- 4502 Knap HolwJun 12, 2024Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 6008 Mount Bonnell CvMar 14, 2024Replacement of electric water heater with a hybrid water heater · 76 m away
- 6004 Upvalley RunMay 8, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system · 83 m away
- 6030 Mount Bonnell CvApr 7, 2025(bosworthstephen) - installation of circuit for elec. vehicle charging station - esip · 94 m away
- 6032 Mount Bonnell CvOct 5, 2026Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 6011 Mountain Villa DrOct 22, 2025New irrigation install · 104 m away
- 6002 Upvalley RunOct 21, 2025Replacement of complete existing central heat and air system with or without duct work located in hallway with pull down stairs · 107 m away
- 6112 Twin Ledge CirFeb 7, 2024Replacement of complete existing central heat and air system with or without duct work · 123 m away