6029 Mount Bonnell Cv
Austin, TX 78731
6029 Mount Bonnell Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 6029 Mount Bonnell Cv, Austin, TX 78731. The most recent, filed December 8, 2023, covers: “Install evse at garage”.
Compiled from City of Austin records · updated Dec 8, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2023
- since Dec 8, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse at garage
- AppliedDec 7, 2023
- IssuedDec 8, 2023
- WorkDec '23 – Jun '24
- Final inspectionDec 11, 2023
Passed final inspection Dec 11, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse at garage
Install evse at garage
City of Austin permitElectrical PermitFinal- Record
- 2023-156469 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6029 Mount Bonnell Cv
What is being built at 6029 Mount Bonnell Cv?
The latest filing (City of Austin permit 2023-156469 EP, December 8, 2023) covers install evse at garage.
How many permits and filings does 6029 Mount Bonnell Cv have?
1 filing across 1 project, from December 8, 2023 to December 8, 2023.
Is there other construction near 6029 Mount Bonnell Cv?
Yes. Nearby filings include 4508 Knap Holw (replacement of complete existing central heat and air system with or without duct work, Aug 7, 2024); 4504 Knap Holw (install new 10.9kw rooftop solar system and 13.5kw energy storage system for existing residential only, Jan 17, 2024); 4507 Knap Holw (gas line for install stand by generator, Sep 24, 2024).
How do I get alerts for new permits at 6029 Mount Bonnell Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4508 Knap HolwAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 4504 Knap HolwJan 17, 2024Install new 10.9kw rooftop solar system and 13.5kw energy storage system for existing residential only · 50 m away
- 4507 Knap HolwSep 24, 2024Gas line for install stand by generator · 56 m away
- 6002 Mount Bonnell CvAug 20, 2026Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 6032 Mount Bonnell CvOct 5, 2026Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 6030 Mount Bonnell CvApr 7, 2025(bosworthstephen) - installation of circuit for elec. vehicle charging station - esip · 62 m away
- 4502 Knap HolwJun 12, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 6008 Mount Bonnell CvMar 14, 2024Replacement of electric water heater with a hybrid water heater · 71 m away
- 6112 Twin Ledge CirFeb 7, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 6004 Upvalley RunMay 8, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system · 110 m away
- 6114 Twin Ledge CirJan 11, 2024Interior remodel of existing 120 sq ft bathroom · 112 m away
- 6002 Upvalley RunOct 21, 2025Replacement of complete existing central heat and air system with or without duct work located in hallway with pull down stairs · 131 m away