105 Tierra Grande Ct
Austin, TX 78732
105 Tierra Grande Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 105 Tierra Grande Ct, Austin, TX 78732. The most recent, filed October 27, 2008, covers: “River dance phase 4, amended plat of lots 58 & 59, block f”.
Compiled from City of Austin records · updated Oct 27, 2008
- Projects
- 1
- 1 filings
- Latest filing
- Oct 27, 2008
- since Oct 27, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 105 Tierra Grande Ct
What is being built at 105 Tierra Grande Ct?
The latest filing (City of Austin case 10136267, October 27, 2008) covers river dance phase 4, amended plat of lots 58 & 59, block f.
How many permits and filings does 105 Tierra Grande Ct have?
1 filing across 1 project, from October 27, 2008 to October 27, 2008.
Is there other construction near 105 Tierra Grande Ct?
Yes. Nearby filings include 204 Summer Alcove Way (tee into external gas line and run additional line for generator installation, Dec 15, 2023); 12733 Tierra Grande Trl (rebuild existing electrical service to 200a, Feb 5, 2026); 12505 Calistoga Way (install of roof mounted solar panels, Jan 10, 2025).
How do I get alerts for new permits at 105 Tierra Grande Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78732- 204 Summer Alcove WayDec 15, 2023Tee into external gas line and run additional line for generator installation · 124 m away
- 12733 Tierra Grande TrlFeb 5, 2026Rebuild existing electrical service to 200a · 236 m away
- 12505 Calistoga WayJan 10, 2025Install of roof mounted solar panels · 255 m away
- 12533 Tierra Grande TrlNov 20, 2024Install new 18.86kw rooftop solar system and 13.5kw energy storage system for existing residential only · 290 m away
- 12508 Calistoga WayApr 17, 2024Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new 3/4 emt conduit and <60 feet new flex conduit to power the level 2 ev charger at 48amp constant draw · 313 m away
- 12613 Calistoga WayAug 27, 2026Emergency main service repair. work has been completed. replaced panel due to melting on main breaker. * disconnect and reconnect only · 339 m away
- 12900 Tierra Grande TrlOct 30, 2008Leander independent school district elementary school no. 23 · 344 m away
- 12721 Monterey PathDec 10, 2024Utility disconnect/reconnect. install tesla backup gateway. underground. ae. meter can does not need replacing- no espa attached · 355 m away
- 408 Summer Alcove WaySep 20, 2026Etj tesla powershare system: install new tesla gateway 3v (ats) downstream of meter upstream of main panel. refeed main panel with gateway 3v. new 60a circuit with communication lines from gateway to garage to ev charger location · 373 m away
- 405 Summer Alcove WayOct 16, 2024Disconnect and reconnect of the service for install is needed [ae customer] install lvl 2 electrical vehicle charger · 385 m away
- 11900 Montclair BndAug 24, 2007River dance phase 6a — river dance phase 6a at steiner ranch · 393 m away
- 12333 Edenvale PathNov 6, 2026Base: installing a backup battery system and additional meter socket · 469 m away