408 Summer Alcove Way

Austin, TX 78732

Tesla Powershare electrical work permitted in Austin

An electrical permit filed September 20, 2026, covers a Tesla Gateway 3V installation at 408 Summer Alcove Way and a new 60-amp circuit to the garage EV charger location. The City of Austin permit, 2026-121616 EP, is marked final.

Summarized from City of Austin records · updated Sep 20, 2026

Projects
1
1 filings
Latest filing
Sep 20, 2026
since Sep 20, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Etj tesla powershare system: install new tesla gateway 3v (ats) downstream of meter upstream of main panel. refeed main panel with gateway 3v. new 60a circuit with communication lines from gateway to garage to ev charger location

  1. AppliedSep 16, 2026
  2. IssuedSep 20, 2026
  3. WorkSep '26 – Oct '26
  4. Final inspectionOct 14, 2026

Passed final inspection Oct 14, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Etj tesla powershare system: install new tesla gateway 3v (ats) downstream of meter upstream of main panel. refeed main panel with gateway 3v. new 60a circuit with communication lines from gateway to garage to ev charger location

    Etj tesla powershare system: install new tesla gateway 3v (ats) downstream of meter upstream of main panel. refeed main panel with gateway 3v. new 60a circuit with communication lines from gateway to garage to ev charger location

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 408 Summer Alcove Way

What is being installed at 408 Summer Alcove Way?

A City of Austin electrical permit covers a Tesla Gateway 3V and a new 60-amp circuit running to the garage EV charger location.

When was the electrical permit filed?

The permit was filed September 20, 2026, and is marked final.

What is the permit number for 408 Summer Alcove Way?

The City of Austin permit number is 2026-121616 EP.

Does the permit cover an EV charger installation?

It describes a new 60-amp circuit and communication lines from the gateway to the garage EV charger location. It does not specify installation of the charger itself.

What electrical work does permit 2026-121616 EP describe?

The scope includes installing a Tesla Gateway 3V downstream of the meter and upstream of the main panel, then refeeding the panel through the gateway.