12712 Belcara Pl
Austin, TX 78732
Backup battery system permitted at 12712 Belcara Pl
An Austin electrical permit filed Aug. 13, 2026, covers installation of a backup battery system and an additional meter socket at 12712 Belcara Pl. The permit record, 2026-101247 EP, is marked Final.
Summarized from City of Austin records · updated Aug 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2026
- since Aug 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBase: installing a backup battery system and additional meter socket. - etj
- AppliedAug 4, 2026
- IssuedAug 13, 2026
- WorkAug '26 – Oct '26
- Final inspectionOct 13, 2026
Passed final inspection Oct 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket. - etj
Base: installing a backup battery system and additional meter socket. - etj
City of Austin permitElectrical PermitFinal- Record
- 2026-101247 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12712 Belcara Pl
What is being installed at 12712 Belcara Pl?
An Austin electrical permit covers a backup battery system and an additional meter socket at the address.
When was the electrical permit filed for 12712 Belcara Pl?
Permit 2026-101247 EP was filed on Aug. 13, 2026.
Is the permit for new construction at 12712 Belcara Pl?
The permit describes electrical work: installation of a backup battery system and an additional meter socket.
What is the status of permit 2026-101247 EP?
The City of Austin permit record is marked Final.
Does the permit mention any other work at 12712 Belcara Pl?
The permit description lists a backup battery system and an additional meter socket.
Also being built nearby
All of 78732- 12700 Belcara PlApr 17, 2024Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <10 feet new 3/4 emt conduit and <70 feet new flex conduit to power the level 2 ev charger at 48amp constant draw · 60 m away
- 408 Mc Curdy CvJun 30, 2026Installation of new generac generator and service rated automatic transfer switch. austin energy disconnect will be needed ( thomas george) · 65 m away
- 501 Quinlan Park RdOct 28, 2008Longhorn village at steiner ranch retirement community site plan · 90 m away
- 503-1/2 Quinlan Park RdOct 7, 2025Quinlan park water line (with r sp-2021-0176d) · 101 m away
- 500 Quinlan Park RdFeb 10, 2012Steiner ranch phase one, section 10d phase 2 · 212 m away
- 12501 Longhorn PkwyJul 15, 2026Longhorn village amenity expansion · 265 m away
- 100 Dawn River CvDec 4, 2024Installing a 26kw and atss · 268 m away
- 12613 Calistoga WayAug 27, 2026Emergency main service repair. work has been completed. replaced panel due to melting on main breaker. * disconnect and reconnect only · 269 m away
- 700 Lakewood Hills TerMar 2, 2007Steiner ranch phase 1, section 7b — steiner ranch phase 1, section 7b · 275 m away
- 108 Dawn River CvFeb 12, 2024Request to disconnect - install 26 kw generator and transfer switch · 290 m away
- 12721 Monterey PathDec 10, 2024Utility disconnect/reconnect. install tesla backup gateway. underground. ae. meter can does not need replacing- no espa attached · 345 m away
- 216 Dawn River CvDec 12, 2023Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa · 365 m away