Quinlan Park Road water-line plans approved in 2025
City of Austin records show a water-line site plan for Quinlan Park Road, filed June 14, 2024. A later site-plan case for the water line was approved and released on October 7, 2025.
Summarized from City of Austin records · updated Oct 7, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 7, 2025
- since Jun 14, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 503-1/2 Quinlan Park Rd
What is being built at 503-1/2 Quinlan Park Road?
Austin records show site plans for a water line on Quinlan Park Road. The latest case, 12989005, was approved and released on October 7, 2025.
When was the Quinlan Park Road water-line project filed?
The first listed case was filed June 14, 2024. A later case was filed October 7, 2025.
Has the Quinlan Park Road water-line plan been approved?
The October 7, 2025 site-plan case, 12989005, is marked Approved and Released. An earlier case, 12705040, filed June 14, 2024, is marked Expired.
Is construction underway at 503-1/2 Quinlan Park Road?
The records list an approved-and-released site plan for the water line, but do not state whether construction has started.
How much will the Quinlan Park Road water-line project cost?
The records provided do not list a project cost or permit valuation.
Also being built nearby
All of 78732- 501 Quinlan Park RdOct 28, 2008Longhorn village at steiner ranch retirement community site plan · 12 m away
- 408 Mc Curdy CvJun 30, 2026Installation of new generac generator and service rated automatic transfer switch. austin energy disconnect will be needed ( thomas george) · 44 m away
- 12712 Belcara PlAug 13, 2026Base: installing a backup battery system and additional meter socket. - etj · 101 m away
- 500 Quinlan Park RdFeb 10, 2012Steiner ranch phase one, section 10d phase 2 · 115 m away
- 12700 Belcara PlApr 17, 2024Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <10 feet new 3/4 emt conduit and <70 feet new flex conduit to power the level 2 ev charger at 48amp constant draw · 155 m away
- 700 Lakewood Hills TerMar 2, 2007Steiner ranch phase 1, section 7b — steiner ranch phase 1, section 7b · 178 m away
- 12501 Longhorn PkwyJul 15, 2026Longhorn village amenity expansion · 197 m away
- 100 Dawn River CvDec 4, 2024Installing a 26kw and atss · 242 m away
- 108 Dawn River CvFeb 12, 2024Request to disconnect - install 26 kw generator and transfer switch · 285 m away
- 12613 Calistoga WayAug 27, 2026Emergency main service repair. work has been completed. replaced panel due to melting on main breaker. * disconnect and reconnect only · 369 m away
- 216 Dawn River CvDec 12, 2023Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa · 392 m away
- 822-1/2 Quinlan Park RdAug 13, 2007Steiner ranch ph 1, sec 7a, amended plat of · 397 m away