224 Dawn River Cv
Austin, TX 78732
Two rooftop solar systems permitted at 224 Dawn River Cv
Two rooftop solar systems for the existing residence at 224 Dawn River Cv were permitted in 2025. Austin electrical permits dated August 22 and December 8 cover systems rated at 24.65 kW and 5.1 kW, respectively.
Summarized from City of Austin records · updated Dec 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 8, 2025
- since Aug 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 5.100 kw rooftop solar system for existing residential only
- AppliedNov 26, 2025
- IssuedDec 8, 2025
- WorkDec '25 – Jun '26
- Final inspectionMar 2, 2026
Passed final inspection Mar 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 5.100 kw rooftop solar system for existing residential only
Install new 5.100 kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-151948 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 24.650 kw rooftop solar system for existing residential only
Install new 24.650 kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-105610 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 224 Dawn River Cv
What is being built at 224 Dawn River Cv?
Austin permits indicate two rooftop solar systems are being installed at the existing residence: one rated at 24.65 kW and one at 5.1 kW.
When were the solar permits filed for 224 Dawn River Cv?
The 24.65 kW system permit, 2025-105610 EP, was filed August 22, 2025. The 5.1 kW system permit, 2025-151948 EP, was filed December 8, 2025.
What size is the rooftop solar system at 224 Dawn River Cv?
The records list two systems: a 24.65 kW system and a 5.1 kW system.
Are the solar permits at 224 Dawn River Cv final?
Yes. Both City of Austin electrical permits are listed as Final: 2025-105610 EP and 2025-151948 EP.
Is 224 Dawn River Cv a new home construction project?
The permit descriptions specify rooftop solar installations for an existing residence, not construction of a new home.
Also being built nearby
All of 78732- 216 Dawn River CvDec 12, 2023Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa · 50 m away
- 108 Dawn River CvFeb 12, 2024Request to disconnect - install 26 kw generator and transfer switch · 184 m away
- 100 Dawn River CvDec 4, 2024Installing a 26kw and atss · 250 m away
- 12721 Monterey PathDec 10, 2024Utility disconnect/reconnect. install tesla backup gateway. underground. ae. meter can does not need replacing- no espa attached · 311 m away
- 425 Dawn River CvSep 4, 2025Replacement of an existing water heater water heater swap out · 353 m away
- 205-1/2 Lago Verde DrJul 22, 2020207 lago verde · 394 m away
- 203 Lago Verde DrFeb 18, 2020203 & 205 lago verde drive · 408 m away
- 12712 Belcara PlAug 13, 2026Base: installing a backup battery system and additional meter socket. - etj · 410 m away
- 205 Lago Verde DrMar 2, 2007Mcwilliams dock · 412 m away
- 201 Lago Verde DrSep 10, 2024201 lago verde drive · 415 m away
- 107 Lago Verde DrFeb 11, 2020107 lago verde · 416 m away
- 105 Lago Verde DrJan 7, 2014105 lago verde boat dock · 419 m away
More solar installs in 78732.