Rooftop solar and energy storage permitted at Austin home

Austin permits indicate a new 22.1-kW rooftop solar system and 27-kW energy storage system for an existing residence at 201 N Lowell Ln. The city issued the installation permit on September 5, 2025, following a disconnect-and-reconnect permit filed August 21, 2025.

Summarized from City of Austin records · updated Sep 5, 2025

Projects
2
2 filings
Latest filing
Sep 5, 2025
since Aug 21, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 22.100 kw rooftop solar system and 27kw energy storage system for existing residential only

  1. AppliedAug 20, 2025
  2. IssuedSep 5, 2025
  3. WorkSep '25 – Mar '26
  4. Final inspectionDec 5, 2025

Passed final inspection Dec 5, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 22.100 kw rooftop solar system and 27kw energy storage system for existing residential only

    Install new 22.100 kw rooftop solar system and 27kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 201 N Lowell Ln

What is being installed at 201 N Lowell Ln?

Austin permits indicate a new 22.1-kW rooftop solar system and 27-kW energy storage system for an existing residence.

When were the solar permits filed for 201 N Lowell Ln?

The disconnect-and-reconnect permit, 2025-105622 EP, was filed August 21, 2025. The installation permit, 2025-105618 EP, was filed September 5, 2025.

Is 201 N Lowell Ln a new home construction project?

The installation permit describes the work as being for an existing residence, not a new home.

Is a battery or energy storage system planned at 201 N Lowell Ln?

Yes. The September 5, 2025 permit describes a 27-kW energy storage system alongside the rooftop solar installation.

Is the electrical service being upgraded at 201 N Lowell Ln?

The August 21, 2025 permit says the work ties in the solar and energy storage components without upgrading the service or meter size.

What is being built near Ways2well on Bee Caves Road?

At 201 N Lowell Ln, about 502 meters from Ways2well at 8226 Bee Caves Rd, permits indicate rooftop solar and energy storage work for an existing residence.

Also being built nearby

All of 78733

More warehouses & industrial in 78733, solar installs in 78733.

Email me when a new permit is filed